Loading...
Town Center L3B3-LR020617Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: June 17, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M-0201003-C-19 FIELD TEST DATA LOCATION OF PLACEMENT: Sidewalk in front of building. DATE CAST: 5/20/02 SUPPLIER: TXI WEATHER: clear TICKET NO.: 110042 TIME: 1:14 pm MIX NO.: 494 admix NO. OF CYLINDERS: 4 CEMENT: * SLUMP: 5 inches FLY ASH: * AIR CONTENT: 6 % WATER: * UNIT WEIGHT: * FINE AGGREGATE: * TEMPERATURE CONCRETE: 89 F COARSE AGGREGATE: * AMBIENT AIR: 79 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 0 gallons ADMIXTURE: * BATCH TIME: 1:25 pm FIELD DATA SUBMITTED BY: K.Houston IX] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER [x] CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB LAB NUMBER: C-003035 DATE RECEIVED: 5/21/02 CYL TYPE OF AGE TEST TOTAL LOAD DIAM~:ER CYLIN-DER AREA FRACTURE !C0~PRE~SiVE S'~EN~TH ID CURING (days) DATE (lb-f) (kN) (in.) isq, in.) i(sq. cm)' & CAPPING (P-~ii-- . (M-Pai_ ' A 1F/EL 7 5/27/02 131690 586 6.000 28.27 182.4 D & N 4658 32.1 B 1F/27L 28 6/17/02 153410 682 6.000 28.27 182.4 D & N 5426 37.4 C 1F/27L 28 6/17/02 129060 574 6.000 28.27 182.4 D & N 4565 3t.5 D 1 F/-- L HOLD REMARKS: coNIcAL §pECi'~ED COMpRESSIvE STRENG'rH AT 28 DAYS 3600 ~4.8 TEST RESULTS COMPLY WITH SPECIFICATION I * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 3t, C 173 or 231, C 138, C 143, C 172, C 1064. 3) Moist cure 4) B c'\ CONICAL CONICAL AND AND SPLIT SHEAR FRACTURE TYPES SHEAR COLUMNAR CAPPING METHODS N = neoprene pads S = sulfur cappin9 compound P = 9ypsum capping compound Randall B Harvey,ET.~