Loading...
Town Center L3B3-LR020613 GILES ENGINEERING ASSOCIATES, ]]NC. -6EOTECklNICAL, ENVIRONMENTAL AND CONSTRUCTION MATEi~ALS CONSULTANTS- · 10722; N. Stemmoas Freeway, Dallas, TX 75~20 ! ('114) 355-~85~ ! FAX: (21o,) 358-5884 N8 W22350 Johnson Road Suite A1 / Waukesha, WI 53156 / (414) 544-0118 / FAX: (414) $49-$868 11507 North Creek Parkway South, Suite 10~, Bothell, WA 98011/~06-771-5775/FAX:206-?71-5557 8300 Guilford Road, Suite F1 Columbia, MD 21046/410-312-9950/FAX;410-312-9955 4801 Voges Road, Madison, WI $3074/605-835-9708/FAX:608-835-3194 3990 Flowers Road, Suite 530, Atlanta, GA 30360t?70-458-3399/FAX: 770-458-3399/FAX: 770-458-3998 DAILY FIELD MONITORING REPORT CLIENT: Mycon 208 E. Louisiana St. McKinney, TX 75069 DATE: 6-13-02 WEATHER: Clear PROJECT: PROJECT NO.: FIELD REP.: First American Bank Denton Tap Road & Town Ctr. Drive Coppell, TX 4M-0201003 Jason Wheeler/Ricky Casas CONCRETE PLACEMENT OBSERVATIONS As requested, a Giles Engineering Associates, Inc. (Giles) representative was present at the above referenced site to observe the placement of concrete, and perform field control tests. Observations indicated 9 cubic yards of Mix No. 9783 concrete was placed this date for the sidewalk and light base. The concrete was monitored and tested in regards to type, slump, temperature and batch to placement time. 1 set of 4 concrete cylinders were cast for laboratory strength testing. Prior to the placement of concrete, the placement area was checked for the removal 6f water, loose soil and unsuitable materials. Based on our observations and field testing, the concrete placed this date appeared to be in accordance with the project specifications. Locations and elevations of tests were assessed in accordance with the accuracy and proximity of provided survey control. Unless otherwise noted, the test locations and elevations were assessed by pacing and hand level methods. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and in this location. Randall B. Harvey,ET Manager, Materials Testing Division Distribution: Mycon General Contractor, c/o Gene Scaffer; City of Coppell, c/o Tom Cantou 6-13-02/ml