Loading...
Town Center L3B3-LR020529 Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemrnons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: May 29, 2002 Report of Concrete Compression Test PROJECT: First American Sank Denton Tap Rd. & Town Center Dr, Coppell, TX PROJECT NQ: 4M-0201003-C-19 FIELD TEST DATA LOCATION OF PLACEMENT: Sidewalk in front of building. DATE CAST: 5/20~02 WEATHER: clear T1ME: 1:14 pm NO. OF CYLINDERS: 4 SLUMP: 5 inches AIR CONTENT: 6 % UNIT WEIGHT: * TEMPERATURE CONCRETE: 89 F AMBIENT AIR: 79 F WATER ADDED ON SITE: 0 gallons BATCH TIME: 1:25 pm IX ] CYLINDER MADE BY GILES IX] CYLINDER PICKED UP BY GILES LAB NUMBER: C-003035 cYL- :F-YP~ (DF ' -A-~'----~ST TOTAL LOAD I ID ! DURING (days) DATE (lb-f) (kN) SUPPLIER: TICKET NO.: MIX NO.: CEMENT: FLY ASH: WATER: FINE AGGREGATE: * COARSE AGGREGATE: #2 COARSE AGGREGATE: * ADMIXTURE: FIELD DATA SUBMITTED BY: [ [ TX~ 110042 494 admix K. Houston CYLINDER MADE BY OTHER CYLINDER DELIVERED TO LAB DATE RECEIVED: 5/21/02 iDIAMETER; CYLINDER AREA i FRACTURE iCOMPRESSIVE STRENGTHI (in.) ~ (sq. in.) (sq. crn) & CAPPING i (psi) (MPa) '~ '~ F/~6L 7 5/27/02 B 1F/27L 28 6/17/02 C 1F/27L 28 6/17/02 D 1 F/-- L HOLD 131690 586 6.000 28.27 182.4 D & N 4658 32,1 REMARKS: CONICAL CONICAL CONICALAND AND SPLtT SHEAR SPECIFIED COMPRESSIVE S~-E~-(~-A'I:'-~-8--D~YS 3600 24.8 28 DAY SPECIMENS NOT YET TESTED ] "INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C31,C 173 or 231,C138, C143, C172, C1064. 3) Moist cure 4) D ~ E FRACTURE CAPPING METHODS TYPES N = neoprene pads S = sulfur capping compound P = gypsum capping compound Randall B a y ,