Loading...
Town Center L3B3-LR020522Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 I FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: May 22, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M-0201003-C-13 FIELD TEST DATA LOCATION OF PLACEMENT: curb and drive through lanes. DATE CAST: 4/24/02 SUPPLIER: TXI WEATHER: overcast TICKET NO.: 3117858 TIME: 7:45 am MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMP: 5 inches FLY ASH: * AIR CONTENT: 3 % WATER: UNIT WEIGHT: * FINE AGGREGATE: * TEMPERATURE CONCRETE: 85 F COARSE AGGREGATE: * AMBIENT AIR: 70 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 20 gallons ADMIXTURE: * BATCH TIME: 6:55 am FIELD DATA SUBMITTED BY: Wilson [X] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER IX] CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB LAB NUMBER: C-002834 DATE RECEIVED: 4/25/02 ~YL~TYPE OF AGE- - ' -TE~ TOT,~L LO~D D~AMETER CYLInDeR AREA FRACTURE IcoM~RESSIVE~'rR~GTH ID CURING (days) DATE (lb-f} ~1~- (in) ; (sq~ni~7(sq. Om) & CAPPING (p~ F (~a) A 1-F/~I~-- 3~'---4/27/02 7-69g0 34~ 6.000---~'~;~7 182.4 O & h ' ~22 -- :1~i~ B 1F/6L 7 5/1/02 92640 412 6.000 28.27 182.4 0 & N 3276 22.6 C 1F/27L 28 5/22/02 112770 502 6.000 28.27 182.4 C & N 3988 27.5 D 1F/27L 28 5/22/02 128900 573 6.000 28.27 182.4 E & N 4559 31.4 E 1 F/-- L HOLD REMARKS:. CONICAL ' -SPECIFIED COMPRE"§SIVE STRE-N-(~¥H-/~Y28~S 4000 27,6 TEST RESULTS COMPLY WITH SPECIFICATION I * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511~ 2) Fietd ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) moist cure 4) B C ~-'" D CONICAL CONICAL AND AND SPLIT SHEAR / E FRACTURE i TYPES SHEAR COLUMNAR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping com. p'ound Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: May 22, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-14 FIELD TEST DATA LOCATION OF PLACEMENT: Firelane; of north face of bank. DATE CAST: 4/24/02 SUPPLIER: TXI WEATHER: overcast TICKET NO.: 3118439 TIME: 1:30 am MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMP: 5 inches FLY ASH: * AIR CONTENT: 2 % WATER: * UNIT WEIGHT: * FINE AGGREGATE: * TEMPERATURE CONCRETE: 89 F COARSE AGGREGATE: * AMBIENT AIR: 70 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 25 gallons ADMIXTURE: * BATCH TIME: 12:55 am FIELD DATA SUBMITTED BY: Wilson [X ] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER IX ] CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB LAB NUMBER: 6-002836 DATE RECEIVED: 4/25/02 :CY~ TYP~(DF' 7 --~-G-E TEST TOTAL LOAD ID CURING (days) j DATE I (lb-f) : (kN) A 1 F/2L 3 4/27/02 96300 428 B 1F/CL 7 5/1/02 105880 471 C 1F/27L 28 5/22/02 129470 576 D 1F/27L 28 5/22/02 124550 554 E 1F/- L HOLD DIAMETER CYLINDER AREA FRACTURE iCOMPRESSIV~E STRENGTH! (in.) i (sq. in.) I($q. cra) ~ . . , ~ CAPPING (psi) , (MPa) 6.000 28.27 182.4 D & N 3406 23.5 6.000 28.27 182.4 D & N 3745 25.8 6.000 28.27 182.4 C & N 4579 31.6 6.000 28.27 182.4 C & N 4405 30.4 I REMARKS: SPE~-I~IED COMPRESSIVE sTRE~GTH~AT 28 DAY-S c 400° --- 27.6 TEST RESULTS COMPLY WITH SPECIFICATION I * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C31,C173or231,C 138, C143, C172, C1064 3) moist cure 4) A %\ -~' B C %,,--! CONICAL CONICAL CONICAL AND AND SPLIT SHEAR D / E  FRACTURE TYPES SHEAR COLUMNAR CAPPING METHODS N = neoprene pads = sulfur capping compound gypsum capping compound Randall B Harvey,ET. ~" Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-3fi8-5885 / FAX: 214-358-5584 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: May 22, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-12 FIELD TEST DATA LOCATION OF PLACEMENT: paving at the west side of bank building DATE CAST: 4/24/02 SUPPLIER: TXI WEATHER: overcast TICKET NO.: 3118175 TIME: 10:30 am MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: SLUMP: 4 inches FLY ASH: * AIR CONTENT: 2 % WATER: * UNIT WEIGHT: * FINE AGGREGATE: * TEMPERATURE CONCRETE: 85 F COARSE AGGREGATE: * AMBIENT AIR: 76 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 25 gallons ADMIXTURE: BATCH TIME: 9:58 am FIELD DATA SUBMITTED BY: Wilson [X] CYLINDER MADE BY GILES [ X ] CYLINDER PICKED UP BY GILES LAB NUMBER: C-002835 CYL TYPE OF : AGE ID CURING ] CYLINDER MADE BY OTHER ] CYLINDER DELIVERED TO LAB DATE RECEIVED: 4/25/02 TEST TOTAL LOAD DIAMETER CYLINDER AREA ~RACTURE rCO~P~[~TRENGTHi i (MPa) (days) DATE (lb-f) (kN) (in) (sq. in.) i (sq, cra) & CAPPING i (psi) A tF/2L 3 4/27/02 114720 510 6.000 28.27 182.4 C & N 4057 28.0 B 1F/6L 7 5/1/02 118770 528 6.000 28.27 182.4 D & N 4201 29.0 C 1F/27L 28 5/22/02 146110 650 6.000 28.27 182.4 D & N 5168 35.6 D 1F/27L 28 5/22/02 150750 671 6.000 28.27 182.4 D & N 5332 36.8 E 1F/-- L HOLD REMARKS: SPECIFIED COMPRESSIVE STRENGTH AT 28 DAYS 4000 27.6 TEST RESULTS COMPLY WITH SPECIFICATION I * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or 231, C 138~ C 143, C 172, C 1064. 3) moist cure 4) CONICAL CONICAL CONICAL AND SHEAR COLUMNAR AND SPLIT SHEAR FRACTURE TYPES CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping comp~un~ Randall B Harvey,ET./