Loading...
Town Center L3B3-LR020514Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: May 14, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-18 FIELD TEST DATA LOCATION OF PLACEMENT: Northwest entrance approach. DATE CAST: 5/7/02 SUPPLIER: TXI WEATHER: sunny TICKET NQ: 3125339 TIME: 1:20pm MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMP: 7 inches FLY ASH: * AIR CONTENT: 3 % WATER: * UNIT WEIGHT: * FINE AGGREGATE: * TEMPERATURE CONCRETE: 95 F COARSE AGGREGATE: * AMBIENT AIR: 86 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 10 gallons ADMIXTURE: * BATCH TIME: 11:48 am FIELD DATA SUBMITTED BY: Wilson IX] CYLINDER MADE BY GILES [ [X] CYLINDER PICKED UP BY GILES [ LAB NUMBER: C-002917 CYL: TYPE OF ID CURING A 0F/3L B 0F/7L C 0F/28L D 0F/28L E OF/-- L ] CYLINDER MADE BY OTHER ] CYLINDER DELIVERED TO LAB DATE RECEIVED: 5/7/02 AGE TEST TOTAL LOAD ;DIAMETER CYLINDER AREA FRACTURE COMPRESSIVE STRENGTH (days) DATE (lb-f) (~')- (in) (sq. i_aZ) (sq.'om) ~& CAPPING ' (l~si) ~ --"i~P'~_ _ 3 5/10/02 107740 479 6.000 28.27 182.4 D & N 3811 26.3 7 5/14/02 104980 467 6.000 28.27 182.4 D & N 3713 25.6 28 6/4/02 28 6/4/02 HOLD SPEciFIED COMPRESSIVE STRENGTH AT 28 DAYS 28 DAY SPECIMENS NOT YET TESTED REMARKS: 4000 27.6 INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C31,C173or231, C138, C143, C172, C1064. 3) moist cure 4) B C ~ O E \ // FRACTURE TYPES CONICAL CONICAL CONICAL AND sHEAR COLurvlNAR AND SPLIT SHEAR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping co~pound / Randall B Harvey,ET'