Loading...
Town Center L3B3-LR020430Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 30, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-9 FIELD TEST DATA LOCATION OF PLACEMENT: driveway and parking paving 150 ft. south and 50 ft. west of southwest corner of parking lot. DATE CAST: 4/3/02 SUPPLIER: WEATHER: clear TICKET NO.: TIME: 9:30 am MIX NO.: NO. OF CYLINDERS: 5 CEMENT: SLUMP: 6 inches FLY ASH: AIR CONTENT: 2.8 % WATER: UNIT WEIGHT: * FINE AGGREGATE: TEMPERATURE CONCRETE: 68 F COARSE AGGREGATE: AMBIENT AIR: 54 F #2 COARSE AGGREGATE: WATER ADDED ON SITE: 0 gallons ADMIXTURE: BATCH TIME: 8:55 am FIELD DATA SUBMITTED IX] CYLINDER MADE BY GILES [ IX ] CYLINDER PICKED UP BY GILES LAB NUMBER: C-002685 [CYL ~YPE OF AGE TEST TOTAL LOAD ID CURING (days) DATE ' (lb-f)'- (kNi- i (in.) Texaslndustries 3106184 8206 BY: Rau ] CYLINDER MADE BY OTHER ] CYLINDER DELIVERED TO LAB DATE RECEIVED: 4/4/02 (sq. in.) ~ (sq cm) i & CAPPING ]~~;LINDE~REA ~R~,~TIJRE ]~'SfvlFRE-S~;IVE ~:F-REN~TH: (psi) i (MPa)__ , A" 1FI2L - 3 .... 4/~6/02' 9i180 ' 406 6.000 28.27 182.4 c & N 3225 22.2 B 1F/6L 7 4/10/02 129290 575 6000 28.27 182.4 D & N 4573 31.5 C 1F/27L 28 5/1/02 171140 761 6.000 28.27 182.4 D & N 6053 41.7 D 1Ft27L 28 511102 166800 742 6.000 28.27 182.4 D & N 5899 40.7 E 1 F/-- L HOLD REMARKS: CONICAL SPECIFIED COMPRESSIVE STRI~I~T'H AT~8 DAYS 4000 27.6 TEST RESULTS COMPLY WITH SPECIFICATION ~ INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) moist cure 4) c ~ o ~ E FRACTURE CAPPING METHODS , N = neoprene pads TYPES S = sulfur capping compound ..... P = gypsum capping c~o~,pound CONICALsHEARAND SHEAR COLUMNAR Rand;i-i B Har eyTE-+ , . CONICAL AND SPLIT Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 30, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-12 FIELD TEST DATA LOCATION OF PLACEMENT: paving at the west side of bank building DATE CAST: 4/24/02 WEATHER: overcast TIME: 10:30 am NO. OF CYLINDERS: 5 SLUMP: 4 inches AIR CONTENT: 2 % UNIT WEIGHT: TEMPERATURE CONCRETE: 85 F AMBIENT AIR: 76 F WATER ADDED ON SITE: 25 gallons BATCH TIME: 9:58 am [XI CYLINDER MADE BY GILES SUPPLIER: TXI TICKET NO.: 3118175 MIX NO.: 8206 CEMENT: * FLY ASH: * WATER: FINE AGGREGATE: * COARSE AGGREGATE: * #2 COARSE AGGREGATE: * ADMIXTURE: * FIELD DATA SUBMITTED BY: Wilson ] CYLINDER MADE BY OTHER ] CYLINDER DELIVERED TO LAB DATE RECEIVED: 4/25/02 [X] CYLINDER PICKED UP BY GILES [ LAB NUMBER: C-002835 C~L' T;(-F;~: o~ ~,-GE ..... -:I'E~TT To-TALLO_AD~AMETER CYLiNDE-~ ARE~, #RACTuR~OMP~ESSI~-~:Y~'~NGT~i ID CURING (days) DATE (lb-f) (kN) , (in.) (sq. in.) (sq. cra) & CAPPING, (psi) (MPa) A 1F/2L 3 4/27/02 114720 510 6.000 28.27 182.4 ¢ & N 4057 28.0 B 1F/6L 7 5/t/02 118770 528 6.000 28.27 182.4 ¢ & N 4201 29.0 C 1F/27L 28 5/22/02 D 1 F/27L 28 5/22/02 E 1 F/-- L HOLD REMARKS: / CONICAL 1) 2) Field ASTM test methods used: 3) moist cure 4) CONICAL CONICAL AND SHEAR COLUMNAR AND SPLIT SHEAR ~ECIFIED C;OMPRESSIvE STRENGTFi-A'I'-28 DAYS ' 4000 - 27.6 28 DAY SPECIMENS NOT YET TESTED I * INFORMATION NOT SUPPLIED Laboratory ASTM test methods used: C 39, C 617, C 511 C 31, C 173 or 231, C 138, C 143, C 172, C 1064. FRACTURE TYPES CAPPING METHODS N = neoprene pads S = sulfur capping compound P: gypsum ~pi~gzo~,n~und Randall B Harvey,ET. Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 30, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-13 FIELD TEST DATA LOCATION OF PLACEMENT: curb and drive through lanes. DATE CAST: 4~24/02 SUPPLIER: TXI WEATHER: overcast TICKET NO.: 3117858 TIME: 7:45 am MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: SLUMP: 5 inches FLY ASH: AIR CONTENT: 3 % WATER: UNIT WEIGHT: * FINE AGGREGATE: TEMPERATURE CONCRETE: 85 F COARSE AGGREGATE: * AMBIENT AIR: 70 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 20 gallons ADMIXTURE: * BATCH TIME: 6:55 am FIELD DATA SUBMITTED BY: Wilson [X] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER ix] LAB NUMBER: CY~- TYPE OF AGE ; ID C~U?!NG (days) A 1F/2L 3 B 1F/6L 7 C 1F/27L 28 D 1F/27L 28 E 1 F/-- L HOLD CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB C- 002834 DATE RECEIVED: 4~25~02 TEST ' TOTAL~(~'~)-' DIETER '~'~LINDER ARE~R~TUF~E C6M-PRESSIV~ STRENGTH 4/27/02 76950 342 5/1/02 92640 412 5/22/02 5/22/02 6.000 28.27 182.4 D & N 2722 18.8 6.000 28.27 182.4 D & N 3276 22.6 - 'SPECIFIED~)~RE§~ivE STRENGTH AT 28 DAYS ' ' 4000 ' 27.6 REMARKS: CONICAL 28 DAY SPECIMENS NOT YET TESTED ] * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C31, C 173or231, C 138, C 143, C 172, C 1064. 3) moist cure 4) CONICAL CONICAL AND SHEAR COLUMNAR AND SPLIT SHEAR FRACTURE TYPES CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping compound Randall B Harvey,ET. Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 30, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-10 FIELD TEST DATA LOCATION OF PLACEMENT: driveway and parking paving sampled 130 ft. east from southeast corner. DATE CAST: 4/3/02 SUPPLIER: Texas Industries WEATHER: sunny TICKET NO.: 3106873 TIME: 12:15 pm MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMP: 5 1/2 inches FLY ASH: * AIR CONTENT: 2.4 % WATER: * UNIT WEIGHT: FINE AGGREGATE: * TEMPERATURE CONCRETE: 72 F COARSE AGGREGATE: * AMBIENT AIR: 58 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 0 gallons ADMIXTURE: * BATCH TIME: 11:20 am FIELD DATA SUBMITTED BY: Rau iX] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER ] CYLINDER DELIVERED TO LAB DATE RECEIVED: 4/4/02 iX ] CYLINDER PICKED UP BY GILES [ LAB NUMBER: C- 002687 : CYL~ TYP~ OF AGE TEST TOTAL LOAD ;DIAMETER CYLINDER AREA: F'AhCTuR~':~6~i~R~-SiVE STR~NGfH ID CUR NO (days) i ...... DATE (lb-0 (kN) ¢ (in.) (sq. in.) (sqT~mi & CAPPING (psi) (MPa) A 1F/2L 3 4/6/02 109130 485 6.000 28.27 182.4 D & N 3860 26.6 B 1F/6L 7 4/10/02 133150 592 6.000 28.27 182.4 O & N 4709 32.5 C 1F/27L 28 5/1/02 173610 772 6.000 28.27 182.4 D & N 6140 42.3 D 1F/27L 28 5/1/02 174950 778 6.000 28.27 182.4 D & N 6188 42.7 E 1 F/-- L HOLD REMARKS: SPECIFIE~ ~C~)-MPRESSIVE S-TRENGT~-AT 2-8 DAYS - 4000 : 27.6 TEST RESULTS COMPLY WITH SPECIFICATION I * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) moist cure 4) CONICAL CONICAL CONICAL AND AND SPLIT SHEAR FRACTURE TYPES ~HEAR COLUMnaR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping comp~gund Randall B' H~rv~E-T~ Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Daiias, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 30, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd, & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-8 FIELD TEST DATA LOCATION OF PLACEMENT: driveway parking lot paving 25 ft. south and 40 ft. west from southwest corner. DATE CAST: 4/3/02 SUPPLIER: Texas Industries WEATHER: clear TICKET NO.: 3106058 TIME: 7:25 am MIX NO.: 8206 NO. OF CYLINDERS: 4 CEMENT: SLUMP: 5 inches FLY ASH: * AIR CONTENT: 1.6 % WATER: * UNIT WEIGHT: * FINE AGGREGATE: TEMPERATURE CONCRETE: 68 F COARSE AGGREGATE: * AMBIENT AIR: 52 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 0 gallons ADMIXTURE: BATCH TIME: 7:00 am FIELD DATA SUBMITTED BY: Rau IX] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER IX] CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED TO LAB LAB NUMBER: 6-002684 DATE RECEIVED: 4/4/02 CYL TYPE OF AGE ID CURING (days) TEST TOTAL LOAD DATE (lb-f) (kN) A 1F/CL 7 4/10/02 107480 478 B 1F/27L 28 5/1/02 171830 764 C 1F/27L 28 5/1/02 141260 628 D 1 F/-- L HOLD iDIAMETERI CYLINDER AREA: FRACTURE ICOMPRESSIVE STRENGTHi (in.) (sq. in,) ~.__cm_)_ _ & CAPPING --(~i)`, j ~Pa) 6.000 28.27 182.4 D & N 3801 26.2 6.000 28.27 182.4 D & N 6077 41.9 6.000 28.27 182.4 C & N 4996 34.4 REMARKS: CONICAL SPECIFIED 6~3MPRESSWE STRENGTH AT 2S-DAYS ' '4000 7-" 2716 TEST RESULTS COMPLY WITH SPECIFICATION / * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C 31, C 173 or231, C 138, C 143, C 172, C 1064 3) moist cure 4) C D CON[GAL CONICAL AND SHEAR AND SPLIT SHEAR COLUMNAR FRACTURE TYPES CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping co~,ound Randall B Harvey,ET. Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 214-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 30, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-14 FIELD TEST DATA LOCATION OF PLACEMENT: Firelane; of nodh face of bank. DATE CAST: 4/24/02 SUPPLIER: TXI WEATHER: overcast ' TICKET NO.: 3118439 TIME: 1:30 am MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: * SLUMP: 5 inches FLY ASH: * AIR CONTENT: 2 % WATER: UNIT WEIGHT: * FINE AGGREGATE: * TEMPERATURE CONCRETE: 89 F COARSE AGGREGATE: AMBIENT AIR: 70 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 25 gallons ADMIXTURE: BATCH TIME: 12:55 am FIELD DATA SUBMITTED BY: Wilson IX] CYLINDER MADE BY GILES [ ] CYLINDER MADE BY OTHER ix] LAB NUMBER: CYL TYPE OF ID CURING (days) DATE Ob-f) A 1 F/2L 3 4/27/02 96300 B 1F/6L 7 5/1/02 105880 C 1 F/27L 28 5/22/02 D 1F/27L 28 5/22/02 E 1 F/-- L HOLD CYLINDER PICKED UP BY GILES [ ] CYLINDER DELIVERED 'FO LAB C- 002836 DATE RECEIVED: 4~25~02 AGE : -f~S'F TOTAL LOAD --~I-AI~'I=:zF~i CYLi~)-ER AREA! FRACTURE ~0MPRESSI~'~'rRENGTHi (kN) (in) ! (sq. in.) ; (sq. cm) & CAPPING (psi) (MPa) 428 6.000 28.27 182.4 c & N 3406 23.5 471 6.000 28.27 182.4 C & N 3745 25.8 SPECIFIED COMPRESSIVE STRENGTH AT 28 DAYS 28 DAY SPECIMENS NOT YET TESTED REMARKS: 4000 27.6 * INFORMATION NOT SUPPLIED 1) Laboratory ASTM test methods used: C 39, C 617, C 511. 2) Field ASTM test methods used: C31, C 173 or 231, C 138, C 143, C 172, C 1064. 3) moist cure 4) CONICAL CONICAL CONICAL AND SHEAR COLUMNAR AND SPLIT SHEAR CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum cappin9 compound Randall B Giles Engineering Associates, Inc. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS 10722 North Stemmons Freeway / Dallas, TX 75220 / 214-358-5885 / FAX: 2'f4-358-5884 CLIENT: Mycon General Contractor 208 E. Louisiana St. McKinney, TX DATE: April 30, 2002 Report of Concrete Compression Test PROJECT: First American Bank Denton Tap Rd. & Town Center Dr. Coppell, TX PROJECT NO.: 4M- 0201003-C-14 FIELD TEST DATA LOCATION OF PLACEMENT: Firetane; of north face of bank. DATE CAST: 4/24/02 SUPPLIER: TXI WEATHER: overcast TICKET NO.: 3118439 TIME: 1:30 am MIX NO.: 8206 NO. OF CYLINDERS: 5 CEMENT: SLUMP: 5 inches FLY ASH: * AIR CONTENT: 2 % WATER: * UNIT WEIGHT: * FiNE AGGREGATE: * TEMPERATURE CONCRETE: 89 F COARSE AGGREGATE: * AMBIENT AIR: 70 F #2 COARSE AGGREGATE: * WATER ADDED ON SITE: 25 gallons ADMIXTURE: * BATCH TIME: 12:55 am FIELD DATA SUBMITTED BY: [X] CYLINDER MADE BY GILES [ Wilson CYLINDER MADE BY OTHER CYLINDER DELIVERED TO LAB [X] CYLINDER PICKED UP BY GILES [ ] LAB NUMBER: C-002836 DATE RECEIVED: 4/25/02 CY[~:' ~"~TP~oF - AGE TEST %~o~'ALI_OA~i~]~,-'~;YLINDERAR~ ~RA~TUR~ iCO~R-e§-~i~)~ SYREr~YRi ID ; CURING (days) DATE -(l~;f) - (kN) (in.) (scl] in.) i(s~. cm~ & CAPPING - A 1F/2L 3 4/27/02 128980 574 6.000 28.27 182.4 C & N 4562 31.5 B 1 F/EL 7 5/1/02 C 1 F/27 L 28 5/22/02 D 1 F/27L 28 5/22/02 E 1 F/-- L HOLD 1 REMARKS: SPECIFIED COMPRESSIVE STRENGTH ~,T 28 DAY--S' ' 4.000- ~ 27.6 28 DAY SPECIMENS NOT YET TESTED ~ * INFORMATION NOT SUPPLIED J A\ CONICAL 1) Laboratory ASTM test methods used: C 39, C 617, C 511 2) Field ASTM test methods used: C31,C173or231, C 138, C143, C172, C1064. 3) moist cure 4) B C D /,~ E CONICAL CONICAL AND SHEAR COLUMNAR AND SPLIT SHEAR FRACTURE TYPES CAPPING METHODS N = neoprene pads S = sulfur capping compound P = gypsum capping comp~und Rand~li B I--t~rve;,~T~/