Loading...
Wynnpage Plaza-LR020522Construction Materials Testing and ~nvironmen~l Consulting Texas CMT, P. 0~ 10044 Monroe Drive · Dallas, T~xas 75229 · (214} 352-6957 · Fax (ZI4) 352-6972 - www .texascmt.com REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Densit~ Re.oort No. 8 (201-0111) Method: ASTM D2922 D3017 D698 pag of 1 Client: Wnlnr. eott and Associatea Mamnal Desenp/inn Maximum Opumum D~ Mo/state D~it~ Content Project: W~np~e PIn~ (Lb~CuFt) Pe~at Test Dam: May 20, 2002 I. Dark B~ S~ay C~y 1~.8 t0.~ Report Date: May 22. 2002 Required De~iw (I):95- 105% Required Mois~re (~): Optimum + Mai L~a0on/Ele~adon (and/or) Ldl Iq-Piece In-Place Percem No. D~ De~ity Mo~turg Com~ac~on Probe D~th Z 4' W. of the wes~ edg< of D<mon Tap Rd.. ~t~ay from ~e t6 e~e of approach, top ot flex bas< 117.3 12.7 96.6 Test results meet project specificatiom cc: Mr. lam~ ]~?attOn - Waimcott & AasociatL~ Mr. Rick O'Oell - Cffy ot (~oppell - Pax: 972-;304-3570 TOTAL P.03 ['1~4 -~4-~C40~ 13:21 Construction Materials Testing and Environmental Con~ultiug Texas CMT, I1'1C. P. 02 10044 Monroe Drive · Dallas, Texas 75229 (214) 352.6957 Fax (214) 352-6972 ° www .texasemt.com REPORT OF EN-PLACE DENSITY AND MOISTURE OF SOIL Densi~ Report NO_ 7 (201-0111) Method: ASTM 172922 D3017 D698 P~l~e 1 of 1 Client: W~,i-~cott and Associates Mate~a_l .D__e~.nptmn Maximum Optimum Project; Wynnp~e ~a (~a~CuFt) Pcm~t Test Date: ~y 16, 2002 {pm) 1. Dark Bm~ ~dy C~y I~-8 10.0 Report Date: May 22, 2002 Required De~iW ( %):95 - 105% Required Moism~ (~): Optimum + (Lhs/CuFt~ Content 2 Top of flex ba~e - 2' W. of west edge o~ DentOn Ta0 Rd.. about 15 T~rd or' wid~ sou~ ~om ~e no~ edge of approach 109.7 t3.2 90.4* :~Test resulta do not meet project specifications CC: Mr. lames BrattOn - Wai~¢ott & As$0¢iat~ Mr Rick O'Dell - City of Coppe[l - Fax: 972-304--3570 Construction Materiab Tcs~ug Environmental Consulting Texas CMT, linC. P.01 10044 Monroe Drive · Dallas, Texas 75229 · (ZI4) 352.6957 · Fax (214) 352-6972 · www .texascmt.eom REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Densir~ Report No, 6 (201-0111) Method: ASTM D2922 D3017 D698 Pa~¢ o~ ! Client; Wain,scoa and Associates Mamtial Daicrtp~,qn. Maximum Optimum I Dry Maismre Dgnsiry Comen~ Project: Wyrmlmge Plaza (LbWCu~t) P~n:ent Test Date: May 16, 2002 (ant) t. Dark Beowrl Sandy Clay 105.$ 10,0 2. Flex Bal~ 12,1.4 12.4 Report Date: May 2.2, 2002 Required Density ( %);95 - 105% Required Moisture (%): Optimum + Test No. Dry Oen$ily Moislur~ Compa¢Iton Nn ~ LbslCu Ft) Contell[ { % ) Probe Depth '2 East approach - west side 14 i15.7 14.2 95.3 Test results mc:t project Mr James glrat~on - WllilL~cutt &. Assoaiates Mr. Rick O'Detl - City of Coppell - Pax: 9'~2-30a-3570