YMCS-LR020228GEOTECNNICAL AND ~ ~ r-J i i F~
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO: YMCA of Metropolitan Dallas
601 Akard Street
Dallas, Texas 75201
ATTN: Mr. Todd Baker
REPORT NO. 39
REPORT DATE: 02-28-02
REG PROJECT NO. 8524
DATE OBSERVED: 02-15-02
TECHNICIAI":~P~.: Cervantes
PAGE: 1 of 1
CONTRACTOR: Hill & Wilkinson
[ Items Observed:
Panels 1, 6, 9 and 10.
Slab on grade: F to G from 2 to 2.9.
Reference Plans or Notes Used: J Sheet S5.01
~-~There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution: (1)
(1)
(1)
YMCA of Metropolitan Dallas/
Mr. Todd Baker
YMCA of Metropolitan Dallas/
Mr. Curt Hazelbaker
City of Coppell/Mr. Kenneth Griffen
(1) Good Fulton & Farrell/
Mr. Scott Wegener
(1) Hill & Wilkinson/Mr. Lanny Huggins
(1) Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F.Reed, P.E.
KA/m m
2424 STUTZ DR, · SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019