Loading...
YMCS-LR020228GEOTECNNICAL AND ~ ~ r-J i i F~ ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Coppell YMCA 146 Town Center Boulevard Coppell, Texas REPORTED TO: YMCA of Metropolitan Dallas 601 Akard Street Dallas, Texas 75201 ATTN: Mr. Todd Baker REPORT NO. 39 REPORT DATE: 02-28-02 REG PROJECT NO. 8524 DATE OBSERVED: 02-15-02 TECHNICIAI":~P~.: Cervantes PAGE: 1 of 1 CONTRACTOR: Hill & Wilkinson [ Items Observed: Panels 1, 6, 9 and 10. Slab on grade: F to G from 2 to 2.9. Reference Plans or Notes Used: J Sheet S5.01 ~-~There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) (1) (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker City of Coppell/Mr. Kenneth Griffen (1) Good Fulton & Farrell/ Mr. Scott Wegener (1) Hill & Wilkinson/Mr. Lanny Huggins (1) Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F.Reed, P.E. KA/m m 2424 STUTZ DR, · SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019