Loading...
YMCS-LR020208GEOTECHNICALAND ~ F~I I'll I F:~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Coppell YMCA 146 Town Center Boulevard Coppell, Texas REPORTED TO: YMCA of Metropolitan Dallas 601 Akard Street Dallas, Texas 75201 ATTN: Mr. Todd Baker REPORT NO. 37 REG PROJECT NO. 8524 SAMPLE DATE: 02-08-02 TECHNICIAN: W. Eberhardt CONTRACTOR: Hill & Wilkinson Location of Sample lSet Number I Location I Quantity Represented 1 Panel # 2 10/80 Design Information Source of Concrete I Mix Identification I Specified Strength p.s.i. LMC 41 4000 Test Results Set Cylinder Age@ Total Load I CompressiveI Average No. ID Date Tested Test lbs.I IStrength p.s.i. Strength p.s.i. 1 7002 02-15-02 7 101620 3600 7002 03-08-02 28 7002 03-08-02 28 7002 Hold H Cylinder Data Set Cylinder Time of I Concrete Air Ticket N1o. ID Slump Sample Air Temp. Temp. Entrainment Number 7002 4.00 8:15AM 37 46 3.4 7113173 Mail Distribution: (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker (1) YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker (1) City of Coppell/Mr. Kenneth Griffen (1) Good Fulton & Farrell/ Mr. Scott Wegener (1) Hill & Wilkinson/Mr. Lanny Huggins (1) Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/je 2424 STUTZ DR. · SUITE 400 .. DALLAS, TX 75235 · TEL [214] 350 5600 ',' FAX [214] 350 0019