Loading...
YMCS-LR020121 GEOTECHNICAL AND ENVIRONPIENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Coppell YMCA 146 Town Center Boulevard Coppell, Texas REPORTED TO: YMCA of Metropolitan Dallas 601 Akard Street Dallas, Texas 75201 A'I-I'N: Mr. Todd Baker CONTRACTOR: Hill & Wilkinson REPORT NO. 25 REPORT DATE: 01-21-02 REG PROJECT NO. 8524 DATE OBSERVED: 01-16-02 TECHNICIAN: M. Banchetti PAGE: 1 of 1 Items Observed: Retaining wall footings at S.W. property corner of parking area. Reference Plans or Notes Used: I Sheet A1.01 ~---~There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) YMCA of Metropolitan Dallas/ Mr. Todd Baker (1) YMCA of Metropolitan Dallas/ Mr. Curt Hazelbaker (1) City of Coppell/Mr. Kenneth Griffen (1) Good Fulton & Farrell/ Mr. Scott Wegener (1) Hill & Wilkinson/Mr. Lanny Huggins (1) Dowdey Anderson & Associates/ Mr. Bill Anderson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. JFP/mm/pc 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 7S235 · TEL [214] 350 5600 · F.a.X [214] 350 0019