YMCS-LR020121 GEOTECHNICAL AND
ENVIRONPIENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Coppell YMCA
146 Town Center Boulevard
Coppell, Texas
REPORTED TO: YMCA of Metropolitan Dallas
601 Akard Street
Dallas, Texas 75201
A'I-I'N: Mr. Todd Baker
CONTRACTOR: Hill & Wilkinson
REPORT NO. 25
REPORT DATE: 01-21-02
REG PROJECT NO. 8524
DATE OBSERVED: 01-16-02
TECHNICIAN: M. Banchetti
PAGE: 1 of 1
Items Observed:
Retaining wall footings at S.W. property corner of
parking area.
Reference Plans or Notes Used: I Sheet A1.01
~---~There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Mail
Distribution:
(1) YMCA of Metropolitan Dallas/
Mr. Todd Baker
(1) YMCA of Metropolitan Dallas/
Mr. Curt Hazelbaker
(1) City of Coppell/Mr. Kenneth Griffen
(1) Good Fulton & Farrell/
Mr. Scott Wegener
(1) Hill & Wilkinson/Mr. Lanny Huggins
(1) Dowdey Anderson & Associates/
Mr. Bill Anderson
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
JFP/mm/pc
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 7S235 · TEL [214] 350 5600 · F.a.X [214] 350 0019