Loading...
Wynnpage Plaza-CS020920 (2) THE.CITY.OF COPPELL -~ *~,(t.( ""/~ q \ ~ September 20, 2002 Marc O. Bentley, P.E. Bentley Engineering 4125 Broadway Blvd., Ste. 250 Garland, TX 75043 RE: Wynnpage Plaza South, Lot 2, Block A Construction Plan Review Comments Dear Mr. Bentley: The City of Coppell has reviewed the revised plans for the referenced addition. These plans meet our current minimum standards for construction and have been approved. Please submit copies for the City Engineer's stamp. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. All contractors and subcontractors on site must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. These fees consist of roadway impact and construction inspection fees to be paid to this office as requested in the Fee Assessment Letter dated July 18, 2002. The City assesses a 2% inspection fee for all private construction onsite outside the building's footprint. This would include all dirt work, erosion control, paving, storm drain, water lines, sewer lines, drainage pipes, etc. that is private. For all public installations, the City of Coppell charges a 4% inspection fee. If you have any questions, please contact me at (972) 304-3681. Sincerely, ~X~ ~~ Teresa Turner, E.I.T. Graduate Engineer CC: Ken Griffin, P.E. - Director of Public Works/Engineering 255 PARKWAY * P.O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 THE.CITY.OF P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3681 Fax: (972)304-3570 COPPELL ENGINEERING DEPARTMENT FAX COVER SHEET Mr. Martin: The City of Coppell has approved the Wynnpage Plaza South, Lot 2, Block A plans as shown Rick O'Dell will be the construction inspector on the project. He will be contacting you soon to schedule the pre-construction meeting. All fees must be paid prior to the meeting. If you have any questions regarding the payment of fees, please contact Rhonda Brothers at 972-304-3682. If you have any questions, please feel free to contact me at 972-304-3681. CC: Marc Bentley, P.E. IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "City of Coppell Engineering - Excellence By Design" THE.CITY.OF P.O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3681 Fax: (972)304-3570 COPPELL ENGINEERING DEPARTMENT FAX COVER SHEET To: Marc Bentley, P.E. From: Teresa Turner, E.I.T. Fax: 972-240-0922 Date: 9/20/2002 Re: Wynnpage Plaza South Pages: )( 2-- cc: (including cover sheet) Phone: o Urgent DFor Review D Please Comment D Please Reply o As Requested Mr. Bentley: The City of Coppell has approved the Wynnpage Plaza South, Lot 2, Block A plans as shown Rick O'Dell will be the construction inspector on the project. He will be contacting you soon to schedule the pre-construction meeting. All fees must be paid prior to the meeting. If you have any questions regarding the payment of fees, please contact Rhonda Brothers at 972-304-3682. If you have any questions, please feel free to contact me at 972-304-3681. CC: Bruce Martin IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "City of Cappell Engineering - Excellence By Design"