SC-Coppell MSW-LR020913FUGRO SOUTH, INC. ~ ~
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENG TH OF CONCRETE REPORT
CLIENT: Cop_.~D~ c/r~ K A_Sparks ~ _ Report Date: September 13, 2002
PROJECT:~___oppell Middle School We~,_ ~,Te~ Project No.: 0701-2192
SAMPLE DATE: August 14, 2002
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. (°F) (ASTM C-1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group Inc.
CONCRETE SUPPLIER:
PLANT/TRUCK:
MIX ID NUMBER:
AIR (%) (ASTM C-231):
WATER ADDED (gal):
SLUMP (in.) (ASTM C-'143)
Sidewalk on west end of building A
TXI
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12", 28.27 square inches
TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE
CYLINDER AGE DATE LOAD STRENGTH STRENGTH
NUMBER (days) TESTED (pounds) (psi) (psi)
CMS 269 7 8/21/02 102050 3610 4000/28 days
CMS 270 28 9/11/02 130270 4610
CMS 271 28 9/11/02 127170 4460
CMS 272 Hold
Fracture mode is (A) unless otherwise noted
Specifications: Making & ASTM C-31 Testing ASTM C-143. Types°f [~ ~ E~ D
Curing: Methods: ASTM C-39 Fracture: A B C D
REMARKS: Cylinders cast by Contractor. Ali information except test data furnished by Contractor and
assumed to be correct.
Technician: Julio Villarreal
SMH/bg/rm
Distribution:
Review~ By: ~ lt-~L%~,t ,~ ~
K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Jerry Jones (Fax: 972-393-1228)
City of Coppell - Lee Stone
City of Coppell - Garreth CampbelP'-'~
Coppell lSD - Mickey Harper
SHW Group - Mike Elmore
SHW Group - Dale Lilljedahl
TXI