Loading...
PA9702-LR 990830 (3) 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 08/20/1999 Report No.: 9922658 Report Date 08/30/!999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Drilled belled pier inspection. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier inspection. See attached sheet for recorded data. NOTE: Required depth was brought up to 12.0 feet due to water problems. Pier locations were not on Grid line. Piers are numbered in the order they were drilled. Superintendent's plans S2.3, detail 3 shows detail of pier configuration and are numbered in conjunction with pier report. Technician Time: 7:00 a.m. to 12:30 p.m. Technician: Brian Otis ~ ~erillg, Inc. Report Distribution: . ( I ) CiP/of Coppell ( 1 ) City of Coppelt - Engineering (1) Briakley Sargent Architects (1) City ofCoppelt -BIdg. lnsp. Paul D. Smith. P.E. ( 1 ) Turner Engineers ( 1 ) City of Coppell - Leisure Serv Dcpt Senior Project Engineer (I) H isaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approva] of HI3C Engineering. Inc. 991)1' Pa~e l of I REPORT OF DRILLED BELLED PIERS I"BC ENGINI~RING, 11~C. Project: CoppellAquatic/RecreationCtr. ReportNo.: 9922658 300 Block of Parkway Blvd., Coppell, Texas/Prj #96051 Date of service: 08/20/99 Project No.: 94991118 Technician: B. Otis Page: 1 of 1 Pier Identification 1 2 3 Pier Diameter (in.) 18 18 18 Bell Diameter (in.) 48 48 48 Top of Pier Elevation (ft) 96.0 96.0 96.0 · Req. Depth from Exist. Grade (ft) 12.0 12.0 12.0 Initial Depth of Pier from Existing Grade (ft) 14.0 12,2 12.0 Final Depth of Pier from Existing Grade (ft) 14.3 12.6 12.5 Depth from Top of Concrete (ft) 11.2 9.2 12.6 Condition of Bottom (wet or dry) Dry Dry Dry Plumb Within Tolerance (yes or no) Yes Yes Yes -~ Casing Diameter (in) N/A N/A N/A --~ Cased Depth (ft) N/A N/A N/A Number of Vertical Bars (ea.) 6 6 6 Reinforcing Bar Size (#) 6 6 6 Length of Vertical Bars (ft.) 10.7 8.7 12.0 Time Drilling was Completed 8:16 a.m. 9:10 a.m. 9:35 a.m. Time Concrete was Placed 9:55 a.m. 10:10 a.m. 11:20 a.m.