ST9401-CS 981124NOV 24 '98 12:21PM WIER & ASSOCIATES
WIER Sc ASSOCIATES, INC.
ENGINEERING SURVEYING LAND PLANNING
4300 BELTWAY PLACE, Su1TE 1 30 III ARLINGTON, TX 7601 8-1 O97
METRO (81 7 )467-7700 METRO FAx (61 7) 467 - 771 3
E)1-� n A,ftj vnr f� fhn nffnnfinn nf-
P. 1/3
Name Company Area CodatNumber
Robert Bibby
Rebcon
Garreth Campbell
City of Coppell
Martin Ledford
972 304 - 3570
FROM: Ups lane DATE: November 24, 1998
TOTAL # OF PAGES 3
(INCLUDING THIS COVER SHEET)
W&A # 94093
® ORIGINAL WILL FOLLOW VIA:
® Regular Mail
❑ Hand Delivery
❑ Overnight
❑ ORIGINAL WILL NOT FOLLOW
ADDITIONAL MESSAGE:
IF THIS TRANSMISSION IS INCOMPLETE OR UNREADABLE
PLEASE CALL METRO 8171467 -7700 AS SOON AS POSSIBLE
NOV 24 'g8 12 :21PM WIER & ASSOCIATES
%M MEMORANDUM
f`.
TO:
Robert Bibby
FROM:
Ulys Lane
DATE:
11 -24 -98
PROJECT:
Denton Tap Bridge; Coppell, Texas
W&A #:
94093
P.2 /3
Attached is an exhibit indicating the rail treatment, spacing etc. on the ends of the
bridge. Sheet S1 a of 9 indicates the rail treatment to extend 11'- 7.75" beyond the
abutment. The rail needs to extend the full approach slap length or 25'. You pointed
this issue out during your costing of the revised rail design. We will coordinate with
Martin Ledford to revise and re -issue sheet S1 a after the Thanksgiving Holiday.
The metal rail on the approach sides of the bridge will need to include connecting the
metal guard rail. Please call me if you have any questions.
END OF MEMO
Copy to: Garreth Campbell
Martin Ledford
4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700
!' NOV 24 '98 12 :21PM WIER & ASSOCIATES
}
� t
I
N
ou
v
...� V,
V
r Jt
Jcp
P.3 /3
V
Q/T
i
I _ .NOV 24 '98 05 :03PM WIE. & ASSOCIATES
p
P .
w
!i
ix
i�
y `
k �i �/l
MEMORANDUM
TO:
Robert Bibby
FROM:
Ulys Lane
DATE:
11 -24 -98
PROJECT:
Denton Tap Road; Coppell, Texas
W &A #:
94093
P.2/2
57 540 t
We have held review of the handrail shop drawings to be built along the top of the
retaining walls. The City has asked me to verify the grade issues in the field and
determine if part of the wall can be eliminated. Also, where the wall is constructed they
probably will not place rail where the height is 30" or less. The shop drawings indicated
galvanized steel. The design will be steel which is painted. Also, the rail details
indicated setting 6" deep inserts to receive the rail. Our plans indicate 12" deep inserts.
Additionally the City may prefer an ornamental design with more appeal than the current
rail design.
END OF MEMO
4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467 -7700
NOV 24 '98 12:15PM WIER & ASSOCIATES
TM MEMORANDUM
1 :j.
TO: Martin Ledford
FROM: Ulys Lane
DATE: 11 -24 -98
PROJECT: Denton Tap Road; Coppell, Texas
W&A #: 94093
We need the dimensions and steel details for the section detail requested yesterday.
The contractor is working on these details at this time.
Also, when you return, the end rail details need to be changed as per the memo
attached.
END OF MEMO