Loading...
ST9401-CS 981119NOV 19 05: i?PM WIER & ASSOCIATFS P. ~/~ 5-T' . ol MEMORANDUM TO: Ken Griffin Garreth Campboil FROM: Ulys Lane DATE: 11-19-98 PROJECT: Denton Tap Road; Coppell, Texas W&A#: 97043 Martin Ledford verified the maximum span between the beams for the connected bddge change proposed. The maximum span is ten feet. This agrees with the sketch provided in the memo we provided yesterday. Martin is detailing a design at this time for the changes to the east edge of the west bddge slab. He will be adding #5 bar dowels at 5" centers in the top and bottom steel mat at the future slab construction joint, He is preparing a detail at this time for the revisions to the west bridge slab. The only information needed to finish the detail is the width of the concrete edge from back of curb to beginning of paVestone. Please confirm one foot is acceptable or provide another dimension. We are holding the shop drawings for the slab details until Martin completes the revised design. We will forward the revised slab design along with the shop drawings to you hopefully tomorrow. Please call me if you have any comments. Copy to: Robert Bibby END OF MEMO 4300 Beltway Place, Suite 130 Arlington, Texas 76010 metro (817) 467-7700