Loading...
DR0201-CS020830Carter. August 30, 2002 Mr. Ken Griffin City Engineer 255 Parkway Blvd. P.O. Box 478 Coppell, Texas 75019 Ref: Denton County Levee Improvement District No. 1 Construction Plans for Maintenance Dredging of Denton Creek Carter & Burgess, Inc. Job # 992078.020.1.0002 Dear Mr. Griffin: 7950 Elrnbrook Drive D01105. Texas 75247 -4925 Phone: 214.638 0145 Fox: 214.638.0447 www c - b. corn The Denton County Levee Improvement District No. 1 is proposing a project for the dredging of a portion of existing Denton Creek. This maintenance project would be to remove existing sediment and other debris, and divert water during low flows from the Denton Creek Flood Control Channel to the Old Denton Creek. Attached for your review and comments are three (3) set of these construction plans for the "Maintenance Dredging of Denton Creek for the Denton County Levee Improvement District No. 1. These plans are approximately 85% complete. Your review would be greatly appreciated. Please give me a call at 214 - 920 -8077 if you have any questions. Sincerely, CARTER & BURGESS, INC. Terry L. Foyt, P.E. Senior Project Manager TLF /ges Attachment C: \foyt \DENTON COUNTY L.I.D. NO. 1 \Coppell - Plans @ 85% Submittal.doc Carter & Burgess, Inc. Carter & Burgess Architects/ Engineers Inc Carter & Burgess Consultants, Inc. C &B Architects /E rig ineers, Inc. C &B Architects /Engineers, P.C. C &B Nevada, Inc. Nixon & Laird Arc IF itects /Engineers, PC. y aw ZO Ao 0 "Z