Amberpoint BP 2-CS021001Associates ENGINEERS · ARCHtt'~CTS · ScmNTISTS PLANNERS * SURVEYORS October 1, 2002 AVO 20718 8616 NORTHWEST PLAZA DRIVE DAU. AS, TEXAS 75225 (n14) ~ FAX (214) 739-0095 Kenneth M. Griffin, P.E. Director of Engineering & Public Works 255 Parkway Blvd. Coppell, Texas 75019 RE: Amberpoint at Coppell, Lot lA Block a (Staples development) Dear Mr. Griffin: We have reviewed your comments regarding the Civil Engineering plans for the above referenced project. We have addressed the comments as follows: The requested 20' utility easements for the water meter vaults have been added. Sheet CPPOI: ~. The letter requesting the elimination of lime-stabilized sub-grade for parking areas is attached. The ten parking spaces crosshatched are spaces reserved for delivery van parking. ~. The security gate located near the northwest comer of the site has been added. Sheet CDAOI: r~s discussed with Theresa Turner we are now converting the existing curb inlet to a grate inlet structure. The nortbem drive approach has been relocated to align with the proposed fire lane north of the building. Sheet CSDOI: '~We have revised the grading east of the propose building to reflect the original drainage divides created with the plans for the overall Amberpoint development. The hydraulic grade line from the junction structure to the proposed connection to the existing storm sewer system has been recalculated and is reflected on sheet CSD02. DAU.AS · FORT WORTH * HOUSTON * McALLEN TRANSPORTATK)N * WATER RESOURCES * LAND DEVELOPMENT · MUNICIPAL * ENVIRONMENTAL- STRUCTUF~R. MECHN~ICAL * F[;G~I'IIGAL ' SURVEYING * GEO~IRAPH1C INFORMATION SYSTEM~ ARCHITECTURE · LANDSCAPE ~RCHITECTURE * PLANNING "l[ tff Associates ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS * SURVEYORS Mr. Kenneth M. Griffin, P.E. City of Coppell Engineering October 1, 2002 Page 2 Sheet CSDOI: 1'~. Storm Sewer Lateral B1 is now specified as Class IV pipe. ~.The starting hydraulic grade line has been recalculated and is reflected. Sheet CWWOI: ~.~ix-inch cleanouts have been added to the sanitary sewer lines at the north end of the site. · The monument sign is shown now shown on this sheet. We have adjusted the location of the vault, domestic meter, and irrigation meter to avoid any conflicts with the sign. .~We have reconfigured the tap on the existing 12" W.L. as requested. We are tapping the 12" W.L. with an 8" tapping sleeve and valve. The domestic and irrigation tap are located on the proposed 8" W.L. Sheet CWW02: .~The proposed manholes on lines D and E are 5' diameter manholes. Flow lines for line D and Line E have been revised to accommodate the expansion of the Staples facility in the future. If you have any questions please do not hesitate to call me at (214) 346-6324 Sincerely, HALFF ASSOCIATES, INC. Jaime R. Beard cc: Jim Gaspard, Transwestem Commercial Services