Loading...
ST9401-CS021003T H E • C I T Y • O F COFFELL r o f 5 9 x A s 1 ENGINEERING DEPARTMENT FAX COVER SHEET P.O. Box 9478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-7041 To: i 1 _ 1 p> ( 1� 1—tA Dot From: Fax: VI 7 1 3 Da te: 03 Phone: r .( g 1 _7 /, & 7-- *7 Pag (including cover sheet) Re: ��l >!�l (f4> Zt> _ 3CC: ❑ Urgent ❑For Review ❑ Please Comment (9' please Reply ❑ As Requested -Comments: t-4 m Rt4 f L_ ( E> Will@ 1• 1• MEW <��T L A r - r ,d. c) z / -90.4 — 3� 9?,3 IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304 -3679 "City of Coppell Engineenng — Excellence By Design" 1. T WIER & ASSOCIATES, INC. C NGINEK.'"D GYgVCVI LAND PLANNING December 16, 1994 Mr. Kenneth Griffin, P.E. City Engineer Engineering Department City of Coppell 255 Parkway Boulevard Post Office Box 478 Coppell, TX 75019 2141462 -0022 Dear Ken: RE: W &A #94 -093 - REVISED PROPOSAL FOR PROFESSIONAL DESIGN SERVICES - Denton Tap Road Project; Coppell, Texas We have revised the draft contract and opinion of project cost after our last meeting with you on December 13, 1994. The design, construction, logistical and phasing issues we have identified to date are discussed in the revised pre - conceptual design memo entitled "Denton Tap Road - Major Design Elements and Comments." We have revised the "Pre- conceptual Opinion of Probable Construction Cost" for the project to reflect the amended scope of services and other issues we discussed. This opinion of cost is based on pre - conceptual sizes of estimated quantities of anticipated improvements and the anticipated unit prices shown thereon. Improvements generally include demolition, paving, grading, storm drainage, bridge, landscaping, sidewalks, and 16 -inch water main. The total project cost anticipated at this time is $3,607,942, including a 10% contingency. The total project cost is comprised of the following: Paving and Bridge ...................................... ............................... $2,402,366 Storm Drainage .............................................. ............................... $622,776 Water Main Improvements ......................... ............................... $254,800 Subtotal ............................................. ............................... $3,279,942 10% Contingency ............................. ............................... $328,000 TOTAL OPINION OF CONSTRUCTION COST .............. $3.607.942 II�b�4s f C13 LI � • ^� � � -� y� JGMN P. WI[?. /. E.. 9. P. L. H. • YLYG LANE 111, P.E.. q- P.L.S. /1/ � •9FOCIA�(3- RFA $TFVENHON, P.[. RGNALG W. COGMSS ♦3HG ELTWA PLACC. GYITC 130 ARLINSTCIN. TFRAG 11018.1091 METRO 18111 A61 -1'100 IA% 13111 463'1932 9OB GOYTN (q EEwAV (ORT WORT N. TC %AS 16110 -G]98 1811, 9130819 G. H . I. r and points of curvature for the proposed right -of -way and submit final sealed plans and exhibits. 404 Permit `11 � a ,,,�,J 1 f CAIN t eot t h s9a, o ( + ! - � r �v'�i tf �y�l'1✓/ Engineer shall c this Project with the U.S. Army Corps of Engineers and shall obtain the necessary Section 404 Permit required for construction of the Project. Hydraulic Studies /FEMA Coordination Engineer shall not conduct hydraulic backwater studies and coordinate this Project with FEMA to obtain a Conditional Letter of Map Revision related to the proposed bridge improvement. Additional Requirements Engineer shall furnish, upon request by City, one (1) set of film reproducibles of the "Final" approved and dated plans. one (1) set of originals containing the engineer's estimate and any special provisions and specifications, suitable for reproduction shall be provided upon request. If computer aided drafting equipment is used to prepare plans, Engineer shall submit a computer file of the drawings in DXF format. The following may also be requirea or the t;ngineer: 1. Assist City with answering questions of Contractors arising during the advertisement of Project for bids. 2. Assist City, if requested by City, in the opening, tabulation, and review of bids. III. Compensation to Engineer A. City agrees to pay Engineer for all services outlined in Section II a total design fee in the amount of $240,000. (For City's accounting purposes, this fee is comprised of $220,000 for paving, bridge, and storm drainage dsign services and $20,000 for the water main design services.) B. Payment for services rendered by Engineer shall be made as follows: 1. Upon satisfactory completion on plans as set forth herein, and City shall pay to Engineer an percent (40 %) of the design fee the conceptual design upon written request, amount equal to forty as set forth herein. 8