Loading...
PA9702-LR 990830 ONCRETE COMPRE E STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 }ateof Service: 08/20/1999 Report No.: 9922659 Report Date 08/30/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compresslye strength samples. PROJECT DATA ~ONTRACTOR: Hisaw &Assoc. CONCRETE CLASS: 6 Sack ~ONCRETESUPPLIER: Nelson Brothers PLACEMENT DATE: 08/20/1999 BATCnT~IE: 9:lSam YLANT: ]~ TIME SAMPLED: [0:00am BY: Brian Otis ;PECIFICATION REQUIREMENTS WEATIIER CONDITIONS: Clear, warm STREN~Xn: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 92 F CONCRETE: 89 ~ SLUMP: 5.0" Max XRUC~CNO: 219 TICK~TNO: 76705 AIR: N/A AIRCONTENT(%): N/A UNITWEIGItT(pcf): N/A rEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Piers on the snack bar stand ASTM C- 172 ASTM C-39 SAMPLE LOCATION: Piers 1,2,3 REPORT OF TESTS AC T VE YAnnS: 30 CYLINDER MEASURED MAXIM'LrM COMERESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 1 1 6.25 08/27/1999 7 89050 3150 1 2 6.25 08/27/1999 7 87910 3110 Average 3130 1 3 6.25 09/17/1999 28 1 4 6.25 09/17/1999 28 TeehnLcj_an TLrae: See Report #9922658 Iqolze: Tl'd_s raix was ~ta_so used Ize pour the j_nterLor pooa_ waa_3_ from 3_2.5-H-5 I;o 8.5-H.5 to 8.5-H.8 to 3_2.5-H.8 to 12.5-H.5. Concrete was p]_aced by pump ~ruck and had a sa_ump belzween 5 and 6 Lnches. Technician: Started: Finished: ~ ~rirlg~ Inc. Report Distribution: (1) City of Coppell (1) City of Coppell - Engineering Eugene Harbour (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.