Loading...
Amberpoint BP 2-CS021008 (2)T H E C 1 T Y O F C4PPELL A g 1 Mark McGraw, P. E. Halff Associates 8616 Northwest Plaza Drive Dallas, TX 75225 RE: Lot lA, Block A Amberpoint Business Park (Staples) Fee Assessment Letter Deaz Mr. McGraw, S. ~i ~'\ October 8, 2002 Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. No payment is due to the City of Coppell at this time because of the 12/4/01 Development Agreement and the Economic Development Incentive Agreement. The Development Agreement waived the Roadway Impact fees and the Economic Development Incentive Agreement waived all other fees up to $100,000. To date, $12,435.44 of the $100,000 Economic Development Incentive Agreement has been used. This leaves a balance of $87,564.56 to be applied toward other fees To calculate the 2% and 4% construction inspection fees, please provide a copy of the Engineer's estimate or contract to our office. Once those fees are calculated, they will be waived up to the remaining balance. Meters are being ordered. Once they arrive, they can be picked up at the Public Works Service Center, 732 Deforest Road. We look forwazd to working with you on this project. If you have any questions, please feel free to contact me at your convenience. Sincer ly, Kedn~th M. Gri t P.E. Director of Engineering/Public Works cc: Jennifer Armstrong, Finance Director Mary Beth Spleizer, Admin. Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services Andrea Roy, Economic Development Jim Gaspard, Transwestern 235 PARKWAY * P. O.BOX 478 * COPPELL TX 75019 * TEL 972/482 0022 * FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Lot IA, Block A Amberpoint Business Park (Staples) Date: 10/8/2002 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee ~5,.}gg.gg (100% due at Issuance of Buildin Permit) Water Tap Inspection Fee ~{}g~} (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) Q' (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline} $4;~.qg; }y (100% due at Issuance of Water Meter) Water :deter Deposit (Domestic) ~3g.gg (100% due at Issuance of Water Meter} Irrigation/Fireline Meter Deposit ~gg;gg (100% due at Issuance of Water Meter) Wastewater Impact Fee ~?.~48~g (100% due at Issuance of Building Permit} Wastewater Tap Inspection Fee ~~g,gg (100% due at Issuance of Building Permit) Utility Final Inspection Fee $~~8 (100% due at Issuance of Building Permit) Park Fee $~~ 50.00 100% due prior to Council Approval) Roadway Impact Fee $0:~8 $0.00 '(100% due prior to Council A royal) Street Light Fee Information not Avai lable (100% due rior to Acce Lance of Project) Street Sign Fee Information not Avail able (100% due rior to Acce tance of Project) Construction Inspection Fee Information not Available (100% due riot to Start of Construction) TOTAL (All development fees waived per the a"~^-.~; Economic Develo ment Incentive A reement} $0.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APP ROVAL $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: Lot lA, BlockAAmberpoint Business Park (Staples) DATE: 10/8/2002 Water Impact Fee: Domestic Meter(s): 1 - 2 inch = 8 ESU's Irrigation Meter(s): 1 - 2 inch = 8 ESU's 0 = 0 ESU's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $280,00 ea. $5,180.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $205.28 $205.28 (Single family due prior to issuance of building permit) (Ali other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $205.28 $205.28 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 2 Fireline Meter(s) @ $2,092.44 $4,184.88 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigatiou/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $280.00 ea. (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $30.00 $90.00 $2,240.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 Single-family @ $0.00 per lot 0 Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $0.00 $0.00 $0.00 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Lot IA, Block A Amberpoint Business Park (Staples) DATE: 10/8/2002 ROADWAY IMPACT FEE: Service Area * 4 Cate o ** Industrial Land Use ** General Li ht Industrial Buildin Area (sf) 228,000 Develo ment Units ** 228.00 Vehicle Miles er Develo ment Unit ** 1.06 Fee er Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles er Develo ment Unit) x (Fee er Vehicle Mile) _ $72,504.00 * (Figure 2 -Roadway Impact Fee Study) ** (Table 3 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -Roadway Impact Fee Study) (Roadway Impact fees waived per the 1214/01 Development Agreement between the City of Coppell and Amberpoint at Coppell, L.L.C.) Percent of Credit Toward Roadway impact Fees l00% Total Credit $72,504.00 AMOUNT DUE: $0.00