Loading...
ST9401-CS 980723,Texas Michael A. Martin, P.E. Assistant City Engineer City of Coppell 255 Parkway Blvd. P.O. Box 478 Coppell, Texas 75019 RE: Control: 3547- 02- 003,etc. Denton Tap Rd. Mr. Martin, As per your conversation with Mark Pickett on 07/22/98, 0 o o � t-S I J"-r cr"Y� Ir 1) TxDOT will provide the City of Cbppell with the pole, pole mount, sign(s) and mounting hardware for the route sign located inside the City of Coppell's current construction project, to be permanently placed by the City of Coppell at the completion of your project. TxDOT will also provide the City of Coppell with standard sheets for the placement of this sign(s), and a copy of the original plan sheet as a reference for placement. 2) Traffic loop detectors located on north bound Denton Tap Rd. at east bound SH -121 Bypass frontage road: The State will place the two (2) present loops as shown on our plans and one additional loop in the outside lane on north bound Denton Tap Rd. in the permanent concrete. TxDOT will not place the set -back loops located approx. 180' from the intersection due to the current construction in that area by the City of Coppell. TxDOT will place the ground box for these set -back loops with conduit and all wiring leading from that ground box back to the controller cabinet. The City of Coppell will be responsible for the installation of these set -back loops and all wiring, conduit, etc. necessary to tie them into the ground box placed by TxDOT, and for making them operational. 3) All pavement markings through the Denton Tap Rd. intersections with SH -121 have changed due to the completion of both the City of Lewisville and the City of Coppell's construction projects north of the SH -121 bypass. TxDOT will place permanent striping for three (3) through lanes both north and south bound for Denton Tap Rd. stopping at the east bound frontage road of Department of Transportation P.O. BOX 3067 • DALLAS, TEXAS 75221 -3067 • (214) 320 -6100 12000 GREENVILLE AVENUE • DALLAS, TEXAS 75243 -3506 July 23, 1998 '01 r+ An Equal Opportunity Employer K the SH -121 bypass. All permanent striping south of this point will be the responsibility of the City of Coppell to place due to the detour to be placed by your contractor ( Revcon ) once TxDOT has opened Denton Tap did. to traffic. Should you have any questions or require further clarification, please feel free to contact Mr. Mark Pickett at (972) 315 -1838. Cordially, C. Smith Jones, P.E Area Engineer /at copy: Jones (Const.) DNTAPCH.LT