ST9301-CS020910T H E · C: I T Y * 0 F
COPPELL
September 10, 2002
AT&T LOCAL NETWORK SERVICES
Michael J. Early
5501 LBJ Frwy, Suite 810
Dallas, TX 75240
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Early:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
aylor
rdinator
cc: Project file
T H E · C I T Y · 0 F
COPPELL
September 10, 2002
CAPROCK COMMUNICATIONS
Roger Cloninzer
15601 N Dallas Pkwy, Suite 700
Dallas, TX 75001
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Cloninzer:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
Taylor
ordinator
cc: Project file
T H E · C I T Y · 0 F
COP?ELL
September 10, 2002
COSERV
Brian Tomlinson
7701 S. Stemmons
Corinth TX 75065
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Tomlinson:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
aylor
rdinator
cc: Project file
T H E: · C I T Y · 0 F
COPPELL
September 10, 2002
EXPLORER PIPELINE
Patrick Nwakoby
6846 S Canton
Tulsa, OK 74136
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Nwakoby:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility.
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
aylor
rdinator
cc: Project file
255 PARKWAY ~ P O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E * C I T Y · 0 F
COPPELL
September 10, 2002
METROMEDIA FIBER NETWORK
Tommy Capps
5430 LBJ Frwy, Suite 1400
Dallas, TX 75240
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Capps:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
aylor
rdinator
cc: Project file
255 PARKWAY * P O BOX 478 ~ COPPELL TX 75019 · TEL 972/A82 0022 ~ FAX 972/304 3673
T H E · C I T Y · 0 F
COi3PEiSI.
September 10, 2002
OnFIBER CARRIER SERVICES
Tim Norris, Operations Mgr.
1820 N Glenville Dr., Suite 114
Richardson, TX 75081
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Norris:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
Sgi~ .~' oTrad~li~°at o r
cc: Project file
T H E · C I T Y · 0 F
COPi ELL
September 10, 2002
QWEST COMMUNICATIONS
Paul Gonzales
13952 Denver W Pkwy, Bldg 53
Golden, CO 80401
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Gonzales:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
aylor
dinator
cc: Project file
255 PARKWAY * P O.BOX 478 ~ COPPELL TX 75019 * TEL 972/462 0022 W FAX 972/304 3673
T H I~ · C I T Y · 0 F
COPPEi L
September 1 O, 2002
SOUTHWESTERN BELL
Peter Russell
3 Bell Plaza, Room 2124
308 S Akard St
Dallas, TX 75202
RE: Sandy Lake Road ST 93o01
Utility Locations
Dear Mr. Russell:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
~.u~.~.. ~rd~nator
cc: Project file
T H E · C I T Y · O F
COP?ELL
September 10, 2002
TOUCH AMERICA
Mark Paffhousen
130 N. Main St
Butte, MT 59701
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Paffhousen:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard ~vith improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
Suzan(CxxTaylor
C.I.P. CUordinator
cc: Project file
T H E · C I T Y · O F
COPPELL
September I0, 2002
ONCOR
David Dean
1015 Hutton Dr
Carrollton TX 75006
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Dean:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
aylor
rdinator
cc: Project file
T H E · C I T Y · 0 F
COl'FELL
September 10, 2002
ONCOR
Rick Fielding
14400 Josey Lane
Farmers Branch TX 75234
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Fielding:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
C.~i. ' ' ~e.~i~~~crLO{/'
Suz~ y
cc: Project file
T H E · C: I T Y · 0 F
COPPELL
September 10, 2002
TXU Communications Services
Mark Wilson
115 W Seventh St, Suite 308
Ft Worth, TX 76102
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Wilson:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt mad to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
Suzan[C.~Taylor
C.I.P. Coordinator
cc: Project file
255 PARKWAY It P O.BOX 478 It COPPELL TX 75OI 9 It TEL 972/462 0022 It FAX 972/304 3673
COPPELL
September 1 O, 2002
VERIZON COMMUNICATIONS
01ga Sauccdo, Assoc. I.P.
540 W Elm Street
Lewisville TX 75067
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Ms. Saucedo:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
Suza0 ~C. i. p .,:42; Jrad~ln°~ ~ or
cc: Project file
T H E · C I T Y · O F
cOPI i LL
September 10, 2002
AT&T Broadband
Bill Morgan
135 Houston St
Lewisville, TX 75057
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Morgan:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of
the improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and a time schedule for the
relocations. If you do not have any utilities within the project limits, please indicate in
writing to the City.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
cc: Project file
-r H ~ · C ! ? Y · 0 F
COPPELL
September 11, 2002
DALLAS WATER UTILITIES
Hamid Baha
320 East Jefferson, Room 214
Dallas, Texas 75203
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Baha:
Dallas County Public Works is designing construction plans for Sandy Lake Road, ~om
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Dallas Water Utilities reviewed preliminary plans in
July 1996 and provided comments related to their existing 30-, 36-, and 60-inch water
transmission mains located within the project limits. The design of the plans is nearly
complete and we are requesting another review of the plans to detemdne if there are any
conflicts and/or adjustments required. If you need a recent set of plans, Dallas County
will distribute plans at their next Utility Meeting on September 18 at 8:30 a.m. You can
also contact John Mears with Dallas County at 214-653-6407 or me.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of the
improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and existing easements, and a'
time schedule for any relocations.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
· Taylol
oordinator
T H E · G I T Y · 0 I~
COP}gl;I;
September 11, 2002
CITY OF IRVING
Todd Reck
Water Resources Planning Manager
P.O. Box 152288
Irving, Texas 75015
RE: Sandy Lake Road ST 93-01
Utility Locations
Dear Mr. Reck:
Dallas County Public Works is designing construction plans for Sandy Lake Road, from
east of Kimbel Kourt to immediately west of the Coppell city limits. The project will
consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided
boulevard with improved drainage. Irving has an existing 60-inch water transmission
main within the project limits. Dallas County has provided plans adequate for utility
relocations to all of the potentially impacted utilities throughout the design process and
will distribute the most recent set of plans to anyone who needs them at their next Utility
Meeting on September 18, at 8:30 a.m. Plans are also available from the City.
Coppell is currently acquiring the necessary right-of-way and will manage the
construction of the project. The project will bid in October 2002 and construction of the
improvements is anticipated to start in early 2003. Please provide the City with a
marked-up set of plans showing any necessary relocations and existing easements, and a
time schedule for any relocations.
Your consideration of this matter is appreciated and should you have any questions or
need a set of plans, please call me at 972-304-7019.
Sincerely,
Suza~C. Taylor
C.I..~oordinator
255 PARKWAY 'drP.O BOX 478 lk COPPELL TX 7~019 'JrTEL 972/462 0022 ~FAX 972/304 3673