ST9301-CS020910T H E · C: I T Y * 0 F COPPELL September 10, 2002 AT&T LOCAL NETWORK SERVICES Michael J. Early 5501 LBJ Frwy, Suite 810 Dallas, TX 75240 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Early: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, aylor rdinator cc: Project file T H E · C I T Y · 0 F COPPELL September 10, 2002 CAPROCK COMMUNICATIONS Roger Cloninzer 15601 N Dallas Pkwy, Suite 700 Dallas, TX 75001 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Cloninzer: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, Taylor ordinator cc: Project file T H E · C I T Y · 0 F COP?ELL September 10, 2002 COSERV Brian Tomlinson 7701 S. Stemmons Corinth TX 75065 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Tomlinson: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, aylor rdinator cc: Project file T H E: · C I T Y · 0 F COPPELL September 10, 2002 EXPLORER PIPELINE Patrick Nwakoby 6846 S Canton Tulsa, OK 74136 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Nwakoby: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility. relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, aylor rdinator cc: Project file 255 PARKWAY ~ P O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E * C I T Y · 0 F COPPELL September 10, 2002 METROMEDIA FIBER NETWORK Tommy Capps 5430 LBJ Frwy, Suite 1400 Dallas, TX 75240 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Capps: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, aylor rdinator cc: Project file 255 PARKWAY * P O BOX 478 ~ COPPELL TX 75019 · TEL 972/A82 0022 ~ FAX 972/304 3673 T H E · C I T Y · 0 F COi3PEiSI. September 10, 2002 OnFIBER CARRIER SERVICES Tim Norris, Operations Mgr. 1820 N Glenville Dr., Suite 114 Richardson, TX 75081 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Norris: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, Sgi~ .~' oTrad~li~°at o r cc: Project file T H E · C I T Y · 0 F COPi ELL September 10, 2002 QWEST COMMUNICATIONS Paul Gonzales 13952 Denver W Pkwy, Bldg 53 Golden, CO 80401 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Gonzales: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, aylor dinator cc: Project file 255 PARKWAY * P O.BOX 478 ~ COPPELL TX 75019 * TEL 972/462 0022 W FAX 972/304 3673 T H I~ · C I T Y · 0 F COPPEi L September 1 O, 2002 SOUTHWESTERN BELL Peter Russell 3 Bell Plaza, Room 2124 308 S Akard St Dallas, TX 75202 RE: Sandy Lake Road ST 93o01 Utility Locations Dear Mr. Russell: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, ~.u~.~.. ~rd~nator cc: Project file T H E · C I T Y · O F COP?ELL September 10, 2002 TOUCH AMERICA Mark Paffhousen 130 N. Main St Butte, MT 59701 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Paffhousen: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard ~vith improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, Suzan(CxxTaylor C.I.P. CUordinator cc: Project file T H E · C I T Y · O F COPPELL September I0, 2002 ONCOR David Dean 1015 Hutton Dr Carrollton TX 75006 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Dean: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, aylor rdinator cc: Project file T H E · C I T Y · 0 F COl'FELL September 10, 2002 ONCOR Rick Fielding 14400 Josey Lane Farmers Branch TX 75234 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Fielding: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, C.~i. ' ' ~e.~i~~~crLO{/' Suz~ y cc: Project file T H E · C: I T Y · 0 F COPPELL September 10, 2002 TXU Communications Services Mark Wilson 115 W Seventh St, Suite 308 Ft Worth, TX 76102 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Wilson: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt mad to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, Suzan[C.~Taylor C.I.P. Coordinator cc: Project file 255 PARKWAY It P O.BOX 478 It COPPELL TX 75OI 9 It TEL 972/462 0022 It FAX 972/304 3673 COPPELL September 1 O, 2002 VERIZON COMMUNICATIONS 01ga Sauccdo, Assoc. I.P. 540 W Elm Street Lewisville TX 75067 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Ms. Saucedo: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, Suza0 ~C. i. p .,:42; Jrad~ln°~ ~ or cc: Project file T H E · C I T Y · O F cOPI i LL September 10, 2002 AT&T Broadband Bill Morgan 135 Houston St Lewisville, TX 75057 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Morgan: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and a time schedule for the relocations. If you do not have any utilities within the project limits, please indicate in writing to the City. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, cc: Project file -r H ~ · C ! ? Y · 0 F COPPELL September 11, 2002 DALLAS WATER UTILITIES Hamid Baha 320 East Jefferson, Room 214 Dallas, Texas 75203 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Baha: Dallas County Public Works is designing construction plans for Sandy Lake Road, ~om east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Dallas Water Utilities reviewed preliminary plans in July 1996 and provided comments related to their existing 30-, 36-, and 60-inch water transmission mains located within the project limits. The design of the plans is nearly complete and we are requesting another review of the plans to detemdne if there are any conflicts and/or adjustments required. If you need a recent set of plans, Dallas County will distribute plans at their next Utility Meeting on September 18 at 8:30 a.m. You can also contact John Mears with Dallas County at 214-653-6407 or me. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and existing easements, and a' time schedule for any relocations. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, · Taylol oordinator T H E · G I T Y · 0 I~ COP}gl;I; September 11, 2002 CITY OF IRVING Todd Reck Water Resources Planning Manager P.O. Box 152288 Irving, Texas 75015 RE: Sandy Lake Road ST 93-01 Utility Locations Dear Mr. Reck: Dallas County Public Works is designing construction plans for Sandy Lake Road, from east of Kimbel Kourt to immediately west of the Coppell city limits. The project will consist of the reconstruction of the existing two-lane asphalt road to a four-lane divided boulevard with improved drainage. Irving has an existing 60-inch water transmission main within the project limits. Dallas County has provided plans adequate for utility relocations to all of the potentially impacted utilities throughout the design process and will distribute the most recent set of plans to anyone who needs them at their next Utility Meeting on September 18, at 8:30 a.m. Plans are also available from the City. Coppell is currently acquiring the necessary right-of-way and will manage the construction of the project. The project will bid in October 2002 and construction of the improvements is anticipated to start in early 2003. Please provide the City with a marked-up set of plans showing any necessary relocations and existing easements, and a time schedule for any relocations. Your consideration of this matter is appreciated and should you have any questions or need a set of plans, please call me at 972-304-7019. Sincerely, Suza~C. Taylor C.I..~oordinator 255 PARKWAY 'drP.O BOX 478 lk COPPELL TX 7~019 'JrTEL 972/462 0022 ~FAX 972/304 3673