ST0001-PL020920T H E • C I T Y • O F COPPELL & �� , r � � a o x , I to s September 20, 2002 Mr. Dennis Hammock Infrastructure Services, Inc. 1306 Leyfair Drive Grand Prairie, Texas 75050 -4206 RE: Creekview Drive and Freeport Parkway ST 00 -01 Final Punch List Dear Mr. Hammock: The final walk - through for the above referenced project was conducted on Wednesday, September 18, 2002. The punch lists from the Streets and Utilities Departments are enclosed. The following is a punch list from the Engineering Department for the completion of the project: 1. Complete the placement of the solid sod and the hydro mulch seeding. 2. Adjust and appropriately identify all water valves, and adjust and paint all fire hydrants. 3. Repair concrete paving and damaged curb throughout the limits of the project. 4. Clean up all trash and debris within the project limits. 5. Repair modular wall. 6. Check paving grade deflections throughout the limits of the project. 7. There is standing water in the gutter on the north side of Creekview Drive and west of Freeport Parkway. 8. Clean storm drain and inlets. 9. Complete air relief installation. 10. Replace tree adjacent to Craftmade International, Inc. 255 PARKWAY * P.O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 9721304 3673 11. Provide marked -up set of plans noting any construction changes to the engineer of record. 12. Provide affidavit of payment with a complete list of the sub - contractors. The number of working days originally scheduled for the project was 150 days. Change Order No. 1 added ten days and Change Order No. 3 added five days for a total of 165 working days. As of the date of this letter, 311 working days have been used. No days have been charged for the time period from September 18 to September 20. The working days will continue to accrue until the project is utilized for its intended purpose. Your attention to this matter is appreciated and should you have any questions or need any additional information, please contact me at 972 - 304 -7019. Sincerely, 10 T ✓ Su Ta C.I. C rdinator cc: Larry Wagner, Infrastructure Services, Inc. Enclosures 2