Loading...
ST0001-CS020813Aug 13 02 02:06p PAT CONNOLLY 9727900053 p•2 L� infrastructure services, inc. August 13, 2002 City of Coppell P.O. Box 478 Coppell, Texas 75019 Arm.: Larry Davis RE: Explanation of Billing Dear Mr. Davis, This letter is being sent to explain the billing. As you will see on the billing, the change orders are added/subtracted on a specific line of the billing calculations toward the bottom. Because the change orders take into account the deducts and/or adds to the overall contract, ISI is billing for the full amount of items on the top portion of the billing that may have been altered through change orders. Otherwise, ISI would not be paid the full contract amount of work per the revised contract amount. Thank you for your help in regards to the above, and please do not hesitate to contact Infrastructure Services, Inc. at (972) 399 -8001 if filrther information should be required. Sincerely, i� Philip Bennett Construction Contract Mauisger File: Corr. To (14510007) 711 Rankin Read Ruston nt nma nr���. vaft s wnn nnns W — Inn'A an" nAM