Loading...
ST0001-CS020809Rug 13 02 02:06p PAT CONNOLLY 9727900053 p•3 infrastructure ssrvicos, inc- August 9, 2002 City of Coppell P.O. Box 478 Coppell, Texas 75019 Attn.: Larry Davis RE: Quantity Change Dear Mr. Davis, This letter is being sent to note variations or added quantities for the following: 2" Schedule 40 PVC Conduit Butler Electric installed an additional 130' -0" of conduit on the east side of Freeport Parkway from the pull box supplied by Oncor to the meter pedestal. In addition. Butler installed an additional 25' -0" of conduit to connect the pullbox supplied by Oncor to the Oncor power pole on the south side and west end of Creekview Drive. This is located on the East end of the retaining waH, located by Wayne Morse from Oncor. Thank you for your help in regards to the above, and please do not hesitate to contact Infrastructure Services, Inc. at (972) 399 -8001 if further information should be required. Sincerely. Philip Bennett Construction Contract Manager File: Corr. To (:14510007) 711 RaNdn Wd Hasten TN 8073 roan wwn nnn4