Loading...
ST0102-CS020916'r H &' · C: I 1' Y · 0 t~ COFFELL September 16, 2002 Verizon Communications Mike Martinez 540 W. Elm Street Lewisville, TX 75067 RE: Ruby Road Project # ST01-02 Dear Mr. Martinez: This letter is written as a follow-up to the August 12th letter from Duke Construction concerning the relocation of eight poles along Ruby Road. With this letter I am providing plans showing the power poles (in red) and the future paving (curbs in green). As can be seen all power poles on the south side need to be relocated. Also, at least two poles on the north side need to be relocated. In addition, the poles along the old section of Ruby Road (west end) will need to be relocated. The timeline for this project is to begin the bidding process in October, award the bid and begin construction prior to the end of this year. It is critical that this road be complete by the early part of 2003 to serve a planned development on the south side of Ruby Road, west of Coppell Road. Please contact me with your proposed timetable when you have had an oppommity to review the enclosed plans. If I can answer any additional questions, please feel free to contact me at your convenience. Sincerely, th M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 Enclosure