Loading...
ST0102-CS020909T H £ · C I T Y · 0 F COFPELL September 9, 2002 Mr. Jan Gaston 2734 Tin Top Road Weatherford, Texas 76087-8044 RE: Ruby Road Project ST 01-02 Dear Mr. Gaston: The City of Coppell intends to construct improvements along Ruby Road in the vicinity of property owned by you (600 Ruby Road). The property has two entrances and frontage along the road. The improvements will consist of the realignment and reconstruction of Ruby Road from a two-lane asphalt roadway to a two-lane concrete roadway with drainage improvements, and the installation of approximately 2450 linear feet of 12-inch water line and 730 linear feet of 8-inch sewer line. The construction of this project is anticipated to begin in October 2002 with an estimated construction time of four months. You will be notified in advance of the actual construction start date. It will be necessary to enter and move equipment onto the property for construction purposes. The proposed work on the property is between the existing row of trees and the right-of-way and generally consists of slope grading necessary to tie the proposed finished ground elevation into the existing ground elevation and construction necessary to match the proposed drive approaches to the existing drive approaches. Please refer to the enclosed plan-profile and grading sheet. The City will restore the land back to its original condition to the maximum extent practicable. Where sod, shrubbery, and plants are removed during the construction, such areas will have the same sod, shrubbery, and plants replaced in their prior positions. Your consideration of this matter is appreciated. Should you have any questions or need any additional information please call me at 972-304-7019. Sincerely. _ Suz~ C. Taylor C.I.PfCoordinator Enclosures