ST0102-SY020829PROJECT NO. 9323 AUGUST, 2002 GEOTECHNICAL INVESTIGATION REALIGNMENT OF RUBY ROAD FREEPORT PARKWAY TO COPPELL ROAD COPPELL, TEXAS Presented To: DUKE REALTY CORPORATION DALLAS, TEXAS GEOTECHNICAL AND ENVIRONHENTAL CONSULTANTS August 29, 2002 Project No. 9323 Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75240 ATTN: Mr. Brook Barefoot GEOTECHNICAL INVESTIGATION REALIGNMENT OF RUBY ROAD FREEPORT PARKWAY TO COPPELL ROAD COPPELL, TEXAS Gentlemen: Transmitted herewith are copies of the referenced report. Should you have any questions concerning our findings or if you desire additional information, do not hesitate to call. Geotechnical Engineering Environmental Consulting Construction Materials Testing 2424 STUTZ DR. · SUITE 400 · C)ALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 TABLE OF CONTENTS PAGE INTRODUCTION ................................................................................................... 1 Project Description ...................................................................................... 1 Authorization ............................................................................................... 1 Purpose and Scope ....................................................................................... 1 FIELD AND LABORATORY INVESTIGATIONS ........................................... 2 General ................................... ~ ...................................................................... 2 Field Investigation ....................................................................................... 2 Laboratory Testing ...................................................................................... 3 GENERAL SITE CONDITIONS ......................................................................... 4 Physiography and Geology ......................................................................... 4 Stratigraphy ................................................................................................. 4 Ground Water .............................................................................................. 5 ANALYSIS AND RECOMMENDATIONS .......................................................... 5 Roadway Subgrade ...................................................................................... 5 Pavement Section ......................................................................................... 6 Earthwork .................................................................................................... 6 Construction Observation ........................................................................... 7 ILLUSTRATIONS PLATE PLAN OF BORINGS .............................................................................................. 1 BORING LOGS ....................................................................................................... 2-7 KEYS TO TERMS AND SYMBOLS USED ........................................................ 8&9 LABORATORY TEST RESULTS ........................................................................ 10&l 1 -i- INTRODUCTION Project Description This report presents the results of a geotechnical investigation performed for the realignment of Ruby Road between Freeport Parkway and Coppell Road in Coppell, Texas. orientation of the realignment is shown on the Plan of Borings, Plate 1 Illustrations. The general of the report The project consists of realignment and re-paving of approximately 2,700 feet of roadway designated as Ruby Road. The eastern portion of the roadway is scheduled for re-paving. The western portion of the roadway is scheduled for realignment. It is understood that concrete paving will be used and that the pavement section will be designed in accordance with the City of Coppell specifications. Authorization This investigation was authorized by Mr. Brook Barefoot of Duke Realty Corporation by approval of our Proposal No. 7-61 on July 25, 2001. Purpose and Scope The purpose of this investigation has been to evaluate the general subsurface conditions and provide recommendations for: · description of the soil and ground water conditions as they relate to the performance and construction of the project; · pavement subgrade conditions and recommended stabilization; and · earthwork and testing recommendations. Project No. 9323 - 1 - August 29, 2002 The investigation has included drilling sample borings, performing laboratory testing, analyzing engineering and geologic data and developing geotechnical recommendations. The following sections present the methodology used in this investigation. Recommendations provided herein are site-specific and were developed for the project discussed in the report Introduction. Persons using this report for other than the intended pul~ose do so at their own risk. FIELD AND LABORATORY INVESTIGATIONS General The field and laboratory investigations have been conducted in accordance with applicable standards and procedures set forth in the 2002 Annual Book of ASTM Standards, Volumes 04.08 and 04.09, "Soil and Rock, Geosynthetics." These volumes should be consulted for information on specific test procedures. Field Investigation Subsurface conditions were evaluated by six sample borings along the roadway centerline, drilled to a depth of 10 feet in August 2002. The locations of the borings are shown on Plate 1 of the report Illustrations. Borings were advanced between sampling intervals by means of an ATV-mounted drilling rig equipped with continuous flight augers. Samples of cohesive soils were obtained with 3-inch diameter Shelby robes (ASTM D-1587). Borings were backfilled at completion of drilling operations. Project No. 9323 - 2 - August 29, 2002 Sample depth, description of materials, field tests, water conditions and soil classification [Unified Soil Classification System (USCS), ASTM D-2488] are presented on the Boring Logs, Plates 2 through 7. Keys to terms and symbols used on the logs are included as Plates 8 and 9. Laboratory Testing All samples were returned to the laboratory and visually logged in accordance with the USCS. The consistency of cohesive soils was evaluated by means of a pocket penetrometer. Results of the pocket penetrometer readings are presented on the boring logs. Laboratory tests were performed to evaluate index properties, confirm visual classification and evaluate the undrained shear strength of selected samples. Tests and ASTM designations are provided in Table 1. TABLE 1. TESTS CONDUCTED AND ASTM DESIGNATIONS Type of Test ASTM Desiqnation Atterberg Limits D-4318 Moisture Content D-2216 Soil Suction D-5298 The results of these tests are summarized on Plate 10. Two lime series tests were performed on the upper clays to evaluate the potential for stabilization. Test results are summarized on Plate 11. Project No. 9323 - 3 - August 29, 2002 GENERAL SITE CONDITIONS Physiography and Geology Currently (August 2002), the western portion of the realignment is moderately to heavily wooded, with an existing pond located near the western limit of the existing eastern portion of the roadway. The site is located within terraced alluvial soils overlying the Cretaceous Woodbine Formation. The Woodbine Formation typically consists of variably stratified silty and sandy clays, clays, silty and clayey sands, sands, sandstones and shales with occasional interbeds of lignite. Stratigraphy Subsurface conditions were consistent with the local geology and generally consisted of fill underlain by clays and sandy clays. The eastern portion of the project is currently paved with approximately five to six inches of asphalt concrete underlain by approximately six to seven inches of granular base. The fill was limited to those areas of existing roadway. The fill consisted of brown to dark brown, low to moderate plasticity (CL) clayey sand and sandy clay. The fill was present to depths of two to three feet. Underlying the fill beneath the existing roadway, and from the ground surface elsewhere, was moderate plasticity (CL) clay and sandy clay. The clay and sandy clay were dark brown changing with depth to brownish-yellow and light gray. Borings were terminated in the sandy clays. Project No. 9323 - 4 - August 29, 2002 Ground Water Free ground water was not noted in the borings at the time of this investigation (August, 2002). The depth to and amount of ground water will fluctuate with variations in seasonal and yearly rainfall. ANALYSIS AND RECOMMENDATIONS Roadway Subgrade It is our understanding select areas of the western portion of the roadway will bear on fill. Fill utilized at the site should consist of either site excavated or equal soil, or "select" fill placed and compacted in accordance with the Earthwork section. Lime stabilization of the roadway subgrade will be required. The amount of stabilization will be dependent upon the specific materials exposed at completion of grading. Based on the laboratory tests on the existing soils within the section, a minimum of 6 percent hydrated lime, or the equivalent of 27 pounds of lime per square yard for a depth of 6 inches should be anticipated for budget purposes. Lime stabilization should be conducted in accordance with Texas Department of Transportation (TxDOT) "Standard Specifications for Construction of Highways, Streets and Bridges," 1993 Edition, Item 260. Lime-stabilized soils should be compacted to a minimum of 98 percent of maximum density as determined by TxDOT Test Method 113-E. Project No. 9323 - 5 - August 29, 2002 Pavement Section Reinforced concrete is anticipated for the design pavement. The specific traffic loads and frequency is undefined. Considering anticipated use, a minimum six-inch concrete section is recommended. Concrete should have a minimum 28-day compressive strength of 3,000 pounds per square foot (psi). The pavement should be reinforced in accordance with the City of Coppell general specifications. Earthwork All vegetation and topsoil containing organic material should be cleared and grubbed at the beginning of earthwork construction. Areas that will underlie fill should be scarified to a depth of 6 inches and recompacted to a minimum of 95 percent of the maximum density, as detexmined by ASTM D-698, "Standard Proctor". The moisture content should be at or above optimum. Site-excavated soils, where used as fill, should be placed in maximum eight-inch loose lifts and compacted to the moisture and density requirements outlined above. "Select" fill is defined as a uniformly blended clayey sand with a Plasticity Index (PI) of between 4 and 15. Select fill should be placed in maximum 8-inch loose lites and compacted to at least 95 percent of the Standard Proctor density, at a moisture content between -2 to +3 percentage points of optimum moisture. Project No. 9323 - 6 - August 29, 2002 Construction Observation Field density tests should be performed by a representative of this office at a minimum rate of one test per 5,000 square feet per lift for fill underlying paving. Utility trench backfill should be tested at a minimum rate of one test per 150 linear feet of trench per lift. Project No. 9323 - 7 - August 29, 2002 COPPELL RD; LIMIT OF WORK B.,5 EXIST. IBY RD. B-3 B-2 ULINE UMIT OF WORK B-'I Reali_enment Of Ruby Road Freeport Pkwy. To Ruby Rd. Coppell, Texas PLAN OF BORINGS PLATE I riced englpeerlng GROUP Realignment of Ruby Road Project No. 9323 Freeport Parkway to Coppell Road Date: 08-08-02- "L;oppelI' Texas Location: See Plate Pocket Penetrometer Readings uJ CORE Tons Per Sq, Ft. ~ .~ ~- ~ u~ Standard Penetration Tests ~ m ~ DESCRIPTION OF STRATA 61ows per Foot - + LU ~ I 2 3 4 4.5+ 4.5+4 C2 ~ ~ ~ -% ASPHALT (3") GRAVEL 8 SAND (7") CLAY, dark brown, very stiff to hard, w/trace of fine sand S calcareous nodules (CL) "'" SANDY CLAY, brownish-yellow g brown, hard, w/some calcareous deposits (CL) lO- Total Depth = I0 feet Dry @ compeltion. Dry & blocked @ 10' on 08-10-02. 15- BORING LOG B-1 PLATE 2 6EOTI~HNIC~. CONSULTANTS rl~ed engineering Realignment of Ruby Road Project No. 9323 Freeport Parkway to Coppell Road Bate: 08-28-02 Coppell, Texas Location: See Plate 1 ~co CORE Pocket Penetrometer Readings Standard Penetration Tests ~ ~- ~ ~_ DESCRfPT[ON OF STRATA Blows per Foot - ~ e I0 20 30 40 50 60 O- SANDY CLAY, brown, hard, w/calcareous nodules 6 some roots (CL) "'" SANDY CLAY, yellowish-brown, hard  (CL) ~/dJJ!' !" SANDY CLAY, yellowish-brown 6, light 5- ~ gray, hard (CL) Total Depth: 10 feet Dry @ completion. BORING LOG B-2 PLATE 3 reed engineering Realignment of Ruby Road Proiect No. 9323 Freeport Parkway to Coppell Road Date: 08-28-02 Coppell, Texas Location: See Plate LU CORE Pocket Penetrometer Readings P-~ >. 03 ~ Tons Per Sq. Ft. -~ ~' ~3 Standard Penetration Tests *~ ~ m .~I DESCRIPTION OF STRATA Bmows per Foot - + ~ ~ ~ 1 2 3 4 4~+ 0- ~ CLAY, dark bFown, hard, w/calcareous nodules S particles (CL) ~ SANDY CLAY, yellowish-brown, hard,  w/calcareous paFticles ~ nodules (CL) lm Total Depth = 10 feet DFy Q compemtion. 15- BORING LOG B-3 PLATE 4 reed engineering .... s~ou~ , Realignment of Ruby Road Proiect No. 9323 Freeport Parkway to Coppell Road Bate: 08-12-02 Coppell, Texas Location: See Plate 1 tu CORE PocJ~et Penetror~eter Readings > 03 Tons Per Sq.' Ft. --~ ~- o ~ Standard Penetration Tests "- ~ ~ DESCRIPTION OF STRATA e~ows per Foot - LU "'"' ',1[' 1 2 3 4 4,5+ 4.5'H' ~ ~ ~ + 10 20 30 40 ~0 80 0-  ASPHALT (6") GRAVEL (8")  CLAYEY SAND, brown, medium dense, fine (Fill) (SC)  CLAY, dark brown, hard, w/fine sand (CL) - SANDY CLAY, gray g dark brown, hard .!.~ (CL) ~!~'/¢.'~ SANDY CLAY, light gray & ~!!!i! brownish-yellow, hard (CL) lO- Total Depth = 10 feet Dry @ compeltion, Dry g blocked @ 10' on 08-10-02. 15- BOR:INO LOG B-4 PLATE 5 ~4~I~TRI~v~II~N_ [~NSULTANTS -- rl~d engineering .... sRou~ Realignment of Ruby Road Project No. 9323 Freeport Parkway to Coppetl Road Bate: 08-12-02 Coppell, Texas Location: See Plate 1 ~u CORE Pocket Penetrometer Readings ~ ~" ~D ~U Toas Per Sq. Ft. ,~ Standard Penetration Tests ~ m ~ DESCRIPTION OF STRATA Bows per Foot - I.U n,' -It I 2 3 4 4.5+ 4.5++ 0-  ASPHALT (6") . GRAVEL (6'9  CLAYEY SAND, brown, medium dense, fine (Fill) (SC) :!~.~:!~ ~ SANDY CLAY, dark brown, hard (CL) kkk ~/.~ SANDY CLAY, brown, hard (CL)  SANDY CLAY, light gray 6,  brownish-yellow, hard (CL] lO- Total Depth = 10 feet Dry ~ compeltion. Dry & blocked ~ 8' on 08-10-02. 15- BORING LOG B-5 PLATE 6 r~ed engineering ' ' Realignment of Ruby Road Prelect No. 9323 Freeport Parkway to Coppell Road Date: 08-12-02~ "u°ppell' Texas Location: See Plate ~u CORE Pocket Penetrometer Readings i Tons Per Sq. Ft. -~ -~ ~ ~u Standard Penetration Tests ~ ~ ~ DESCRIPTION OF STRATA s~ows per Foot - + LU '~ 1 2 3 4 4.5+ 4.5+4 C~ ~ ~ ~' I0 20 30 40 50 60 0-  ASPHALT {5") GRAVEL (7")  SANDY CLAY, dark brown & brown, very / · · · stiff, w/trace of gravel (Fill) (CL) ~.~~ SANDY(cL) CLAY, dark brown, very stiff ~ ~  SANDY CLAY, brownish-yellow S light  gray, very stiff (CL) lotal Depth = lO leer Dry @ compeltien. Dry & blocked @ I0' on 08-10-02. BORING LOG B-6 PLATE 7 r'-J=OI'EQ~IICAL CONSULTANTS -- reed engineering CROUP Il reed engineering Proiect No. 9323 Date: 08-08-02 BORTNG LOG B-1 Realignment of Ruby Road Freeport Parkway to Coppell Road Coppell, Texas DESCRIPTION OF STRATA ASPHALT (3") GRAVEL S SAND (7") CLAY, dark brown, very stiff to hard, w/trace of fine sand S calcareous nodules (CL) SANDY CLAY, brownish-yellow ~ brown, hard, w/some calcareous deposits (CL) Total Depth = 10 feet Dry ~ cornpeltion. Dry S blocked ~ 10' on 08-10-02. GROUP Location: See Plate 1 Pocket Penetrometer Readings Tons Per Sq. Ft. -~ Standard Penetration Tests Blows per Foot - + ~ I 2 3 4 4.5+ 4.5+-- + I0 20 30 40 50 60 PLATE 2 Fill Type of Fill CLAY (CL) (LL<50) CLAY (CH} (LL>50) SILT (ML) (LL<50} SILT (MH) (LL>50) CLAYEY SAND (SC) SILTY SAND (SM) SAND (SP-SW) CLAYEY GRAVEL IGC) GRAVEL (GP-GW) (weathered) SHALE (unweathered) (weathered) LIMESTONE (unweathered) (weathered) SANDSTONE (unweathered) UNDISTURBED ~ STANDARD (Shelby Tube S PENETRATION NX-Core) TEST ~ THO CONE DISTURBED PENETRONETER TEST Water level at time of drilling. Subsequent water level and date. KEYS TO SYMBOLS USED ON BORING LOGS PLATE 8 ~EOTEC~ 1~3NSULTANT5 · -- re~d ~nglne~rlng GROUP OOHESIONLESS SOILS SPT N-Values Relative (blows/foot) Density 0 - 4 ......................... very Loose 4 -10 ......................... Loose 10-30 ........................ Medium Dense 30-$0 ....................... Dense 50 + ......................... Very Oense SOIL PROPERTIES Pocket Penetrometer (T.S.F.) Consistency <0.25 ..................... Very Soft 0.25-0.50 .............. Soft 0.50-1.00 ............... Medium Stiff 1.00-2.00~ .............. Stiff 2.00-4.00 ............. Very Stiff 4.00 + ................... Hard ROCK PROPERTTES ~ DIAGNOSTIC FEATURES Very Soft .......................... Can be dented with moderate finger pressure. Soft .................................... Can be scratched easily with fingernail. Moderately Hard ............. Can be scratched easily with knife but not with fingernail. Hard ................................... Can be scratched with knife with some difficulty; can be broken by light to moderate hammer blow. Very Hard ......................... Cannot be scratched with knife; can be broken by repeated heavy hammer blows. DEGREE OF WEATHERING DIAGNOSTIC FEATURES Slightly Weathered .............. Slight discoloration inwards from open fractures. Weathered ............................. Discoloration throughout; weaker minerals decomposed; strength somewhat less than fresh rock; structure preserved. · Severely Weathered ........... Most minerals somewhat decomposes; much softer than fresh rock; texture becoming indistinct but fabric and structure preserved. Completely ~leathered .......Minerals decomposed to soil; rock fabric and structure destroyed (residual soil). KEY TO DESCRIPTIVE TERMS ON BORING LOGS PLATE 9 GEOTECHNICAL INVESTIGATION REALIGNMENT OF RUBY ROAD FREEPORT PARKWAY TO COPPELL ROAD COPPELL, TEXAS _Summary_ of Classification and Index Property. Tests Boring No. B-1 B-3 B-4 B-6 Total Moisture Liquid Plastic Plasticity Soil Depth Content Limit Limit Index Suction (feet) (%) (%) (%) (PI) (psf). 1.0 - 2.5 8.6 ...... 9,260 2.0 - 3.5 20.7 ...... 11,360 3.0 - 4.5 15.4 47 13 34 48,450 4.5 - 6.0 15.2 ...... 54,270 9.0 - 10.0 12.1 46 12 34 28,510 0.0 - 1.5 8.6 ...... 54,470 2.0 - 3.5 10.8 ...... 41,790 3.0 - 4.5 12.4 ...... 45,850 4.5 - 6.0 13.4 40 11 29 34,630 9.0 -10.0 7.4 ...... 41,510 1.0 - 2.5 9.5 ...... 3,970 2.0 - 3.5 21.1 ..... 18,290 3.0 - 4.5 15.3 43 11 32 16,370 4.5 - 6.0 16.1 ..... 19,130 9.0 -10.0 15.7 46 13 33 16,710 1.0 - 2.5 12.5 ...... 5,740 2.0 - 3.5 15.5 ...... 5,410 3.0 - 4.5 15.3 ...... 6,320 4.5 - 6.0 15.5 35 11 24 4,730 9.0 -10.0 14.0 ...... 4,110 SUMMARY OF LABORATORY TEST RESULTS PLATE 10 GEOTECHNICAL INVESTIGATION REALIGNMENT OF RUBY ROAD FREEPORT PARKWAY TO COPPELL ROAD COPPELL, TEXAS (Continued) Summary_ of Lime Series Tests Boring NO. B-1 B-4 Liquid Plastic Plasticity Depth Lime Limit Limit Index (feet) (%) (%) (%) (PI) 3.0 - 4.5 -- 47 13 34 3.0 - 4.5 4.0 43 38 5 3.0 - 4.5 6.0 41 35 6 3.0 - 4.5 8.0 41 34 7 3.0 - 4.5 -- 43 11 32 3.0 - 4.5 4.0 48 42 6 3.0 - 4.5 6.0 42 36 6 3.0 - 4.5 8.0 46 28 18 SUMMARY OF LABORATORY TEST RESULTS PLATE 11