WA0002-EM020912WA oo -o4
ENGINEER'S OPINION OF
PROBABLE CONSTRUCTION COST
Project Name: Golden Triangle Mobile Home Park PK No.: 2269- 02.022
Prepared By. Pacheco Koch Consulting Engineers (JDD) Date: 0911212002
No Q
Q uart U
Unit D
Description P
Price T
Total
1 2
250 S
SY C
Clearin and Grubbin $
$20.00 $
$5,0
2 7
710 L
LF F
Full Depth Sawing for Asphalt Concrete Pavement $
$4.00 $
$2,8
3 3
320 S
SY R
Remove Asphalt Concrete Pavement $
$10.00 $
$
4 1
15 L
LF R
Remove & Replace Concrete Curb $
$20.00 $
$3
5
5 3
35 S
SY R
Remove & Re lace Concrete Valle Gutter $
$10.00 $
$3
6 1
110 T
TON A
Asphalt Concrete Fine Grade Binder Course $
$58.00 $
$6,3
7 4
450 C
CY M
Modified Flowable Fill $
$45,W $
$20,2
8 1
1000 L
LF 8
8" PVC Water Pie Class 200 with Fittings $
$45. $
$45,0
9 3
35 L
LF 6
6" PVC Water Pie Class 200 with Fittings $
$35.00 $
$1,2
10 1
105 L
LF 1
Bore -
- ,
$24,6
11 5
5 E
EA 8
8" Gate Valve $
,02 5.00 $
$2,1
12 3
3 E
EA 6
6" Gate Valve
$2,400.00 $
$4,8
13 2
2 E
EA 8
8" X 8" Ta I ing Sleeve $
$2,200.00 $
$6,6
14 3
3 E
EA F
Fire H Brant $
$15 $
$1 0
16 1
1 E
EA D
Drop Inlet Protection $
$
$7
17 4
470 L
LF S
Silt Fence
$1$10.00 $
$4,7 , $
2269 -08
I i
7S
a