Loading...
ST0001-LR021004A LEIGH COMPANY 8908 Ambassador Row Dallas, Texas 752474510 (214) 630 -9745 (214) 630 -9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Project: Creekview Drive and Freeport Parkway Coppell, TX Report No.: 161428 Project No.: 015729 Date of Service: 09/25/2002 Report Date: 10/04/2002 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi @ 28 Days SLUMP (in): 3 - 5" AIR ( %): 3%-5% TEST METHOD: ASTM C-172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 MIX DESIGN I.D.: 4000PSI PLACEMENT DATE: 09/25/2002 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 4:20pm BATCH TIME: 3:30pm TEMPERATURE (F) -AIR 94 F CONCRETE: 86 F TRUCK NO: 972 TICKET NO: 3151241 AIR CONTENT ( %): 3.5 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving SAMPLE LOCATION: Station 20 +40, Station 17 +50, ASTM C -39 REPORT OF TESTS Station 9 +00 east of Creekview Dr. Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 1 4.0 10/02/2002 2 4.0 10/23/2002 3 4.0 10/23/2002 4 Hold on standby until concrete arrived at Services. MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (Ibs. force) si) TYPE 7 108600 384 Unbonded Cap 28 28 4:00pm per Billy wi h Infrastructurg \ A Technician: Damon McDonald Started: 1:15pm Finished: 5 :30pm nO °e Report Distribution: (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. Project (1) Schrickel, Rollins & Assoc., Inc. Unbonded Cap Unbonded Cap Inc. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. O1DK Page 1 of 1 A LEIGH COMPANY 8908 Ambassador Row Dallas, Texas 75247 -4510 (214) 630 -9745 (214) 630 -9819 (fax) REPORT OF CYLINDER COLLECTION Client: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Cylinder Collection Report of Collection Report No.: 161467 Project No.: 015729 Date of Service: 09/26/2002 Report Date: 10/04/2002 On this date, a Rone Engineers, Inc. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: 6:00am - 7:30am Page 1 of 1 Technician: Joe Jernigan Report Distribution: (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. (I) Schrickel, Rollins & Assoc., Inc. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 99DK Page 1 of 1