Loading...
Freeport NIP(7.9)-LR021009 (2)Test No. Date Location Depth Below Final S. G. (feet) Field Density (pcf) Field Moisture Proctor ID Compaction Level 169 09 -10 -02 Truck dock: 58'S, 1'E(1) 0.0 80.5 15.4 2 72.5 170 Truck dock: 100'S, 1'E(1) 0.0 82.4 14.9 2 74.2 REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction REE REPORT OF FIELD DENSITY TESTS Uline Facility Freeport Parkway Coppell, Texas GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS EI IGI r1EERII IG REPORT NO. 104 REPORT DATE: 10 REG PROJECT NO. 9056 TECHNICIAN: D. French PAGE: 1 of 1 Proctor No. ASTM Standard Description Optimum Moisture, Maximum Density, PCF 1 D -698 Dark brown clay 2 D -698 Dark brown clay w /yellowish brown sand 3 D -698 Light brown clay (lime- treated) 4 D -698 Dark brown clay w /trace light gray yellowish brown clay 5 D -698 Dark gray clay 19.0 15.0 17.1 20.3 18.0 103.0 111.0 98.9 101.6 105.4 Indicates failing test, not retested as of this report. Footnote: (1) Measurements referenced from truck dock area. Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn Chandler- Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell /Mr. Larry Davis (1) City of Coppell /Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW /cn 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 G R 1=3 LJ I°