Freeport NIP(7.9)-LR020925 GEOTECNNICAL AND
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
FrUline Facility
eeport Parkway
Coppell, Texas
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
REPORT NO. 107
REG PROJECT NO. 9056
SAMPLE DATE: 09-25-02
TECHNICIAN: Contractor
CONTRACTOR: Duke Construction
Location of Sample
Set Number I Location
1 Leaveout
J Quantity Represented
N/A
Design Information
Source of Concrete I Mix Identification I Specified Strength p.s.i.
N/A N/A 4000
Test Results
Set Cylinder Age @ Total Load [ Compressive Average
No. ID Date Tested Test lbs. I Strength p.s.i. Stren~s.i.
1 3878 10-02-02 7 124700 4410 ~,,--~ ~
3878 10-02-02 7 125000 ~
3878 10-23-02 28 153490
3878 10-23-02 28 159420 5540
Cylinder Data
Set Cylinder
N~. ID
3878
Slump
N/A
Time of ]Concrete Air I Ticket
Sample Air Temp. Temp. Entrainment Number
N/A N/A N/A N/A N/A
Mail
Distribution: (1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1 Pacheco Koch Consulting/
Mr. Jack Evans
(1 Haris Engineering, Inc./
Mr. Ali Haris
(1 Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(I City of Coppell/Mr. Larry Davis
(1 City of Coppell/Mr. Lee Stone
(10sburn Contractors/
Mr. Collin LaFavors
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Keith Atkins
KEA/je ~
2424 STUTZ DR, · SUITE400 · DALLAS, TX75235 · TEL [2141350 5600 ' FAX[214] 3500019
GEOTECHNICAL AND J ~ J==J r'"l U F=l
ENVIRONHENTAL CONSULTANTS
I
CONCRETE CYLINDER TEST REPORT
Uline Facility
Freeport Parkway
Coppell, Texas
REPORTED TO: Duke Realty Corporation
5495 Beltline Road, Suite 360
Dallas, Texas 75254
ATTN: Mr. Mike Cox
REPORT NO. 107
REG PROJECT NO. 9056
SAMPLE DATE: 09-25-02
TECHNICIAN: Contractor
CONTRACTOR: Duke Construction
Location of Sample
Set Number J Location
1 Leaveout
J Quantity Represented
N/A
Design Information
of Concrete
Source
N/A
Mix Identification J Specified Strength p.s.i.
N/A 4000
Test Results
No.Set I CylinderiD
I 3878
3878
3878
3878
Age @ Total Load
Date Tested Test lbs.
Compressive
Strength p.s.i.
Average
Strength p.s.i.
10-02-02 7 124700 4410
10-02-02 7 125000 4420 4420
10-23-02 28
10-23-02 28
Cylinder Data
Set Cylinder
N~. ID Slump
3878 N/A
Time of I Concrete Air I Ticket
Sample Air Temp. Temp. Entrainment Number
N/A N/A N/A N/A N/A
Mail
Distribution: (1) Duke Realty Corporation/
Mr. Mike Cox
(1) Duke Realty Corporation/
Mr. Jeff Langston
(1) Pacheco Koch Consulting/
Mr. Jack Evans
(1) Haris Engineering, Inc./
Mr. Ali Haris
(1) Horn-Chandler-Thomas, Inc./
Ms. Diane Coulson
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Osbum Contractors/
Mr. Collin LaFavors
Submitted by:
REED ENGINEERING GROUP, LTD.
Origina[ Signed By
Keith Atkins
KEA/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019