October 14, 2002
Mr. Kenneth M. Griffin, P.E.
City of Coppell-Director of Engineering/Public Works
255 Parkway Boulevard
Coppell, TX 75019
Re: Salon on the Creek
Creekview Phase Il Addition
Dear Mr. Griffin:
(9721422-D075 p.2
As requested, I have reviewed the proposed paving, grading, and utilities as they relate to shifting
the proposed east drive approximately 6' west. This shift in the proposed drive will have no
impact on utility andlor paving design west of [he easternmost proposed parking. 1 will inform
the Contractor to refrain from any work east of the proposed parking until the revised plans arc
approved by the City, with the exception of the proposed fire hydrant, which will not be impacted
by the shift.
Due to the dispute in the east property line, we will be revising and resubmitting construction
documents with the proposed east drive shifted 6' and an additional 6' removed from the median
nose as soon as possible for administrative approval by the City. Please feel free to call if you
have any questions.
Sincerely,
5P1A ENGrIrNEnERI~S,,,INC.
John W. Spiars, P.E.
Cc: Lyne Norris
1im Witt, City Manager
Gary Sieb, Director of Planning
Tri-Star Construction
C3 ~ ~;;~GC_-
iJ;, 2 <'
~~- v M a ~ ~~ ~ ~~,~~
a,
~ ~, ~
~~~ , ,`
SPIARS ENGINEERING, INC.
730 E. Park Blvd., Suite 210 Plano, TX 75074 (972) 422-0077 • Fax: (972) 422-0075
Oct 14 02 10:47a SPIRRS EhGR [9721422-0075 p.l
p i a r s
E N G I N E E R I N G
(972) 422-0077 PAX (972) 422-0075
FACSIMii.F, TRANSMTTTAT. cT;F.FT
O: FROM'
Mr. Kenneth Griffin, P.E. John Spiars
O MPA NY: DATE:
City of Coppell 10/14/2002
FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER:
(972) 304-7041 2
E~ JOB NUMBER:
Salon On The Creek 02-010
^ URGENT ^ FOR REVIEW ^ PLEASE COMMENT ^ PLEASE REPLY
NOTES:
Mr. Griffin:
Attached please find the letter we discussed late Friday. Thanks.
John
Cc: Lyne Norris
Jim Witt, City Manager
Gary Sieb, Director of Planning
Tri-Star Construction