Loading...
Creekview P2 L1R BA-CS021014Oct 14 02 10:47a SPIRRS EIYGR p i a r s E N G I N E E R I N G October 14, 2002 Mr. Kenneth M. Griffin, P.E. City of Coppell-Director of Engineering/Public Works 255 Parkway Boulevard Coppell, TX 75019 Re: Salon on the Creek Creekview Phase Il Addition Dear Mr. Griffin: (9721422-D075 p.2 As requested, I have reviewed the proposed paving, grading, and utilities as they relate to shifting the proposed east drive approximately 6' west. This shift in the proposed drive will have no impact on utility andlor paving design west of [he easternmost proposed parking. 1 will inform the Contractor to refrain from any work east of the proposed parking until the revised plans arc approved by the City, with the exception of the proposed fire hydrant, which will not be impacted by the shift. Due to the dispute in the east property line, we will be revising and resubmitting construction documents with the proposed east drive shifted 6' and an additional 6' removed from the median nose as soon as possible for administrative approval by the City. Please feel free to call if you have any questions. Sincerely, 5P1A ENGrIrNEnERI~S,,,INC. John W. Spiars, P.E. Cc: Lyne Norris 1im Witt, City Manager Gary Sieb, Director of Planning Tri-Star Construction C3 ~ ~;;~GC_- iJ;, 2 <' ~~- v M a ~ ~~ ~ ~~,~~ a, ~ ~, ~ ~~~ , ,` SPIARS ENGINEERING, INC. 730 E. Park Blvd., Suite 210 Plano, TX 75074 (972) 422-0077 • Fax: (972) 422-0075 Oct 14 02 10:47a SPIRRS EhGR [9721422-0075 p.l p i a r s E N G I N E E R I N G (972) 422-0077 PAX (972) 422-0075 FACSIMii.F, TRANSMTTTAT. cT;F.FT O: FROM' Mr. Kenneth Griffin, P.E. John Spiars O MPA NY: DATE: City of Coppell 10/14/2002 FAX NUMBER: TOTAL NO. OF PAGES INCLUDING COVER: (972) 304-7041 2 E~ JOB NUMBER: Salon On The Creek 02-010 ^ URGENT ^ FOR REVIEW ^ PLEASE COMMENT ^ PLEASE REPLY NOTES: Mr. Griffin: Attached please find the letter we discussed late Friday. Thanks. John Cc: Lyne Norris Jim Witt, City Manager Gary Sieb, Director of Planning Tri-Star Construction