DR0002-MP020906MEADOWCREEK DRAINAGE PROJECT DR OD4)2 O'Brien Engineering, Inc. 1 Qtr 3, 2001 Qtr 4, 2 0D1 Qtr 1, 200 Qtr 2, 2002 Qtr 3, 2002 Qtr 4, 2 ID Task Name May _ _ t Jun Jul 1 Oct J Nov 1 Dec Jan _Feb r _ __ _ Mar _ Apr May LJun J_ul _ Aug_j Oct 1 DESIGN PHASE _Aug - Sep 2 Design 3 Advertisement 4 Bid Opening . 10130 5 City Council .12111 6 RIGHT -OF -WAY 7 Dixon 8 Drainage Esmts (2) I 9 Acquired .8124 10 Abandonment (1) A 9126 11 R.E. Brown 12 Drainage Esmt (1) I 13 Acquired .8124 14 Abandonment (1) A 8126 15 CONSTRUCTION 16 Notice to Proceed .3118 17 Construction (work days) . 78 Construction (over work days) Project: DR 00-02 Task Milestone. Summary Deadline ' (- Date: Fri 906102 Page 1 MEADOWCREEK DRAINAGE PROJECT DR 00-02 O'Brien Engineering, Inc. 16 Notkee to Proceed Contractor to take delivery of precast box culvert the first week in March 2002. 17 Construction (work days) WEEK 1 (Mar. 28 -29) Contractor has not mobilized. WEEK 2 (Apr. 1 - 6) Contractor has not mobilized. WEEK 3 (Apr. 8 -13) Contractor has not mobilized. WEEK 4 (Apr. 15 -19) Contractor has not mobilized. WEEK 5 (Apr. 22 - 26) Contractor has not mobilized. WEEK 6 (Apr. 29 - May 3) Contractor is clearing site and staking centerline of the culvert. Started the Installation of the box culvert on the downstrean end. WEEK 7 (May 6 -10) Contractor is installing the box culvert. Completed the tie-in to the existing 54-inch pipe. May need to realign the headwall to avoid eroding an existing bank- Inspector is talking with the property owner. WEEK 8 (May 12 -17) Property owner does not want to lose tree that would be lost if the headwall is realigned. Contractor poured headwall as shown on the plans. Started placing the fill and hauling in the rock rip rap. Hauled off the debris from the site. WEEK 9 (May 20 - 24) Contractor Is continuing to place the fin. WEEK 10 (May 27 - 31) Contractor Is continuing to place the fill. Contractor placed some of the handrail. WEEK 11 (June 3 -7) Handrail plates did not fit the headwall. Headwall had to be repaired. Constructed manhole and grate inlet. WEEK 12 (June 10 -14) Contractor placed top soil and completed final grading. Placed temporary railing and 8 -inch rock rip -rap. WEEK 13 (June 17 -21) WEEK 14 (June 24 -28) Handrail set, added rock rip-rap and hydro-mulohed. WEEK 16 (July 1 -5) Contractor had problem with erosion and added additional material. WEEK 16 (JULY 8 -12) WEEK 17 (JULY 16 -19) Page 2 MEADOWCREEK DRAINAGE PROJECT DR 00-02 O'Brien Engineering, Inc. WEEK 16 (JULY 22-26) Correcting items noted in the final walk- through. Page 3