SW0001-MP020905RIVERCHASE SIDEWALK SW 0001 PACHECO KOCH ENGINEERING ID Tas Nam Qtr 3, 2001 Qtr 4, 2001 Qtr 1,._2002 Jun Au Se Oct Nov Dec Jan Feb Mar Qtr 2,_2002_ A r Ma Jun Qtr 3, 2002 _ -_ Jul - Aug S Qtr 4, 20D2 Qtr 1 Oct I Nov Dec _Jan -- 1 — — — - -- — -- DESIGN PHASE . Jul -- 2 Design 3 Advertisement 4 Bid Opening . 1018 s City Council &'10122 6 RIGHT -OF -WAY 7 City of Irving 8 Response Received . 10110 9 Approved .5122 10 Dallas Water Utilities 11 Approved .816 12 TXU Electric 13 Response Received .1019 14 Response Received . 7121 15 Acquired by City 16 Lot 11 River Ridge Addition 17 Acquired by City 18 HOA River Ridge Addition i ................. 19 Acquired by City 20 CONSTRUCTION 21 Notice to Proceed .1114 22 Construction Project: SW 00-01 Task Milestone . Summary ^ Deadline Date: Thu Q6W Page 1 RIVERCHASE SIDEWALK SW 00-01 PACHECO KOCH ENGINEERING 2 Design On October 9, 2001 TXU decided not to apprvoe the permit. Sidewalk will need to be redesigned to avoid conflict with TXU transmission Imes. Working with TXU to resolve issue. 7 City of Irving First request sent on September 12, 2001. Second letter sent with revised plans on May 7, 2002. 8 Response Received City of Irving did not approve permit - would not allow elevated portion of sidewalk within their easement. 10 Dallas Water tRliftles First letter sent on Septmber 12, 2001. Second letter send with revised plans on May 7, 2002. 12 TXU Electric TXU denied request for use of easement. The sidewalk must cross beneath the wires within a 50 -foot radius of the transformer tower. TXU sent letter dated March 20, 2002 which provided acceptable areas for the crossing of the TXU easements. City sent letter March 22 with exhibit showing two options for the sidewalk layout. 12 Response Received Did not approve the permit. 14 Response Received Did trot approve the permit. Page 2