Loading...
ST9304-CS021018T H E • C 1 T Y - O F MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Suzan Taylor, CIP Coordinator From: Larry Davis, Construction InspectorOX /a Office Phone: (972) 3043684 Fax: (972) 3043570 Date: October 18, 2002 RE: WALK THRU for Belt Line Road ST 93 -04 A final walk -thru for paving, utilities and drainage on the referenced project has been scheduled for Wednesday. October 23'd at 9:00 a.m. Please let me know if I can be of further assistance. cc: Water Utilities Traffic Control Streets John Mears, Dallas County "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" Ken Griffin - Belt Line Road Walk -thru 1 7 Pa e 1 From: "John Mears" <JMears@dallascounty.org> To: <staylor@ci.coppell.br.us> Date: 10/18/02 9:57AM Subject: Belt Line Road Walk -thru A walk -thru on Belt Line Road will be conducted for paving and drainage improvements on Wednesday, October 23, at 9:00 A.M. The City of Coppell and City of Dallas are encouraged to attend. If either City cannot attend we would like to have any punch list items they may have by next week so that the contractor can get everyting done in a timely manner. Preliminary items have already been provided to the contractor which they are working on and will hopefully have completed by Wednesday. The contractor has been told to contact the cities separately regarding utilities and the traffic signals. We can meet at the field office then go to one end of the project and start from there. I plan on walking most of the project fron one end to the other. If anybody doesn't want to do this they can meet us at intersections or other critical areas if they so wish. CC: <kgriffin @ci.coppell.tx.us >, <amalekou @pbw.ci.dallas.tx.us> Memo routed to: Ken Griffin Glenn Hollowell Suzan Taylor Water Utilities Streets Division Traffic Control John Mears, Dallas County