Loading...
ST9304-CS021016Suzan Taylor - Belt Line Road Pa e 1 5T 9 3 04+ From: "John Mears" <JMears @dallascounty.org> To: <staylor @ci.coppell.tx.us> Date: 10/16/02 8:33AM Subject: Belt Line Road The new traffic signals should be functioning and there already should be at least a partial opening of the south Ianes.There will be split traffic with one lane in each direction for about a week while the contractor completes pavement markings, inlet and pavement repairs, seeding /sodding, etc. after which the entire road will be opened with only punch list items remaining. I gave a copy of the August 16 letter to the contractor and they have been instructed to get with the City directly regarding City utility items. I will conduct a walk -thru on the paving/drainage as soon as Friday or next week. We will probably determine a daytime for the walk -thru at our weekly meeting on Thursday and I will let the City know so that they can attend if desired. CC: <ARobinson @dallascounty.org >, <dholzwarth@dallascounty.org> 3 1 W\ fiYL <. 1 0) W.440 s� w &Z a it%i w►o 4 1p.jb•Z-