St Joseph-LR020928REPORT OF SOIL-LIME MIXTURE PULVERIZATION
Date of Service:
Client No.:
Client:
09/28/02
3829
St. Joseph Village, Inc.
13223 Glad Acres Drive
Dallas, TX 75234
Report No.:
Project No.:
Project:
EN GIN E E RI N G
8901 Cml~nter Frwy, Suite I00
Dallas~ Texas 75247
94021187.0135
94021187
St. Joseph Village
1201 East Sandy Lake Rd
Coppell, TX 75019
Contractor:
Test Location:
Centex Construction Co.
Starleaf Street,
Sta. 0+25 to Sta. 9+00
Specification Requirements:
Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing 1~4 Sieve: 60%
Sample Condition: Field Moist
Test Method: NTCOG
1-3/4" SIEVE lg4 SIEVE
TEST LOCATION % PASSING % PASSING
NO.
1 Sta. 7+50 100 70
2 Sta. 4+00 100 62
3 Sta. 0+80 100 65
Technician: P. Green
Report Distribution:
(1) St. Joseph Village, Inc.
(1) Aguirre Corporation
(1) Centex - Jobsite
(1) City of Coppell - Bldg. Insp.
309
-$ LYNt30N d. COX ..~
Engineering
(1) City of Coppell - Engineering
(1) St. Andrews Management
(1) St. Andrews Management
qox, e.=
Principa~gineer
~ mpo~ is exclmively for ~e me of the client indicated above and s~ll not be ~rodmed ~ f~l without wfi~en approval of~C Engineering.