Loading...
Coppell Bible-CS020725DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-197, Coppell Bible Fellowship, zoning change request from R (Retail) to PD-197-R (Planned Development-197-Retail), to allow the development of an approximately 20,000 square-foot church building, indicating future expansion phases of approximately 53,250 square-feet, on 8.65 acres of property, located at the southeast corner of Sandy Lake and State Roads, at the request of Bill Ward, TGS Architects, Inc. STAFF REP.: Marcie Diamond DRC DATE: July 25, 2002 and August 1, 2002 CONTACT.' Teresa Turner, E.I.T. Graduate Engineer, (972/304-3681) COMMENT STATUS: I /PRELIMINARY I 4b I ~Z€~S€B FYI - A full engineering review has not been conducted at this time. FYI -The proposed Sandy Lake Road plans indicate that there will be median openings at State Road and at Oakbend Drive. The initial church driveway will not have access to a median opening once Sandy Lake Road is complete. Estimated beginning of construction is in June 2006. 1. Sidewalk along State and Sandy Lake Roads may be required. This will be decided prior to the August 151 DRC meeting. 2. If your intent is to request a waiver to the lime stabilization requirement, a letter to that effect will be needed during the engineering review process. 3. The domestic water service should not be taken off of the fire line. 4. Extend the 10" waterline stub-out to the property line along State Road. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM.• Coppell Bible Fellowship Addition Lot I Block A Minor Plat, to allow the development of an approximately 20,000 square-foot church building, indicating future expansion phases of approximately 53,250-square feet on 8.65 acres of property located at the southeast corner of Sandy Lake Road and State Road, at the request of Bill Ward, TGS Architects, Inc. STAFF REP.: Marcie Diamond DRC DATE: July 2S, 2002 and August 1, 2002 CONTACT: Teresa Turner, E.I.T. Graduate Engineer, (972/304-3681) COMMENT STATUS: ~ /PRELIMINARY I ~ I R€~S€B e r~rrn nr~~ 1. Label the easements for the water meters and vaults as `Utility' rather than `Water'. 2. We are evaluating whether or not the temporary construction easement is still needed or if it can be abandoned, This will be addressed at the August 151 DRC meeting. 3. An additional utility easement may be needed with the right-of--way dedication. This also will be addressed at the August 15` DRC meeting.