Coppell Bible-CS020801DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: PD-197, Coppell Bible Fellowship, zoning change request from R (Retail)
to PD-197-R (Planned Development-197-Retail), to allow the development
of an approximately 20,000 square-foot church building, indicating future
expansion phases of approximately 53,250 square-feet, on 8.65 acres of
property, located at the southeast corner of Sandy Lake and State Roads,
at the request of Bill Ward, TGS Architects, Inc.
STAFF REP.: Marcie Diamond
DRC DATE: July 25, 2002 and August 1, 2002
CONTACT: Teresa Turner, E.I.T. Graduate Engineer, (972/304-3681)
COMMENT STATUS: I /FINAL I R€~S€B
FYI - A full engineering review has not been conducted at this time.
FYI -The proposed Sandy Lake Road plans indicate that there will be median openings at State
Road and at Oakbend Drive. The initial church driveway will not have access to a median
opening once Sandy Lake Road is complete. Estimated beginning of construction is in June
2006.
1. Sidewalk along State and Sandy Lake Roads will not be required at this time however, a note
should be included on the plat indicating that sidewalk may be required in the future at the
discretion of the City Engineer.
2. If your intent is to request a waiver to the lime stabilization requirement, a letter to that effect
will be needed during the engineering review process.
3. The sole purpose of the 10" fire line is to provide fire protection to the site. The domestic
water service cannot be taken off of the fire line. The domestic service is typically taken off
just prior to the fire vault.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Coppell Bible Fellowshia Addition, Lot 1. Block A, Minor Plat, to allow
the development of an approximately 20,000 square-foot church building,
indicating future expansion phases of approximately 53,250-square feet on
8.65 acres of property located at the southeast corner of Sandy Lake Road
and State Road, at the request of Bill Ward, TGS Architects, Inc.
STAFF REP.: Marcie Diamond
DRC DATE: July 25, 2002 and August 1, 2002
CONTACT: Teresa Turner, E.I.T. Graduate Engineer, (972/304-3681)
COMMENT STATUS: I I /FINAL €B
e r~rrn nr~~
1. The 40' temporary construction easement is no longer needed and can be abandoned.