Loading...
ST9304-CS 931217FA~TIMATE OF COST SHARING FOR REALIGNMENT OF BELTLINE ROAD 12/17/93 COPPELL DALLAS CROW- TOTAL BILLINGSLEY PAVING/DRAINAGE * $1,134,056 * $3,005,248 * $1,530,975 * $5,670,279 (% of TOTAL COST) (20 %) (53 %) (27 %) (100 %) · . COUNTY $400,000 $1,060,000 $540,000 $2,000,000 PARTICATION AJUS TED $734,056 $1,945,248 $990,975 $ 3,670,279 PAVING/DRAINAGE BRIDGE "X-I" OVER -0- -0- $1,025,800 $1,025,800 GRAPEVINE CREEK TU R/R XING $54,050 $60,950 -0- $115,000 CREEK CHANNEL- -0- -0- $345,000 $345,000 IZATION TU RELOCATION *** $900,000 -0- -0- $900,000 MOCKINGBIRD LN $402,500 -0- $402,500 $805,000 EXTENSION W/ SIGNAL & BRIDGE MOORE ROAD -0- $86,250 -0- $86,250 SIGNALS STREET LIGHTING $25,422 $67,368 $34,320 $127, 110 MF~DIAN $59,800 $158,470 $ 80,730 $299,000 LANDSCAPING TOTAL COSTS $2,175,828 $2,318,286 $2,879,325 $7,373,439 ROUNDED TOTAL + ~$2,200,000 + -$2,300.000 + ~$2,900,000 :!: ~$7,400,000 COSTS · February 9, 1989 cost estimates were adjusted by 15% per letter from Wayne Ginn on June 21, 1993. The low & high estimates were added then together divided by 2 and then adjusted by 15%. · * Dallas County will fund the design cost and about $2,000,000 of the construction costs. Therefore, the paving/drainage numbers have been adjusted by the percentage that each entity is particapating. · ** From 9/17/93 letter from Tim Brancheau w/TU