Loading...
Freeport NIP(7.9)-LR021018REPORTED TO: Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 ATTN: Mr. Mike Cox CONTRACTOR: Duke Construction Items Observed: Reference Plans or Notes Used: x There were no deviations noted. Mail Distribution: (1) Duke Realty Corporation/ Mr. Mike Cox (1) Duke Realty Corporation/ Mr. Jeff Langston (1) Pacheco Koch Consulting/ Mr. Jack Evans (1) Haris Engineering, Inc./ Mr. Ali Haris (1) Horn Chandler- Thomas, Inc./ Ms. Diane Coulson (1) City of Coppell /Mr. Larry Davis (1) City of Coppell /Mr. Lee Stone REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Uline Facility Freeport Parkway Coppell, Texas Civil Drawings GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 111 REPORT DATE: 10 -18 -02 REG PROJECT NO. 9056 DATE OBSERVED: 09 -25 -02 TECHNICIAN: A. Cervantes PAGE: 1 of 1 Er r7EERI 5 Leave -out: 0 to 120'N, 0' to 5'E from the S.W. building corner and office area (mesh wire). The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW /myw 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAx [214] 350 0019 R O U