Loading...
Coppell Bible-CS021025T H E C 1 T Y O F COPPELL ~~ ~~~~ October 25, 2002 Mike Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. 8080 Park Lane, Suite 600 Dallas, TX 75231 RE: Coppell Bible Fellowship Revised Fee Assessment Letter Dear Mr. Daniel Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of 728.52 and forward the check to the Engineering Department along with a copy of the Fee Assessment Table. This amount is the portion of the assessed fees that need to be paid prior to Council approval. Please note that the roadway impact fee has been reduced by 75% because of the dedication of right of way for Sandy Lake Road. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please feel free to contact me at your convenience. Since y, -•,n Kenneth M. , P.E. Director ofEngineering/Public Works cc: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Admin. Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Interim Director of Leisure Services 235 PARKWAY * P.O.BO% 478 * COPPELL T% 73019 * TEL 972/462 0022 * FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Coppell Bible Fellowship Date: 9/20/2002 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,340.00 (100% due at Issuance of Buildin Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $142.10 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $3,215.95 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Imgation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,400.00 (100% due at Issuance of Buildin Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildin Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildin Permit) Park Fee $0.00 $0.00 (100% due riot to Council A royal) Roadway Impact Fee $728.52 $728.52 '(100% due riot to Council A royal) Street Light Fee Information not Avai lable (100% due riot to Acce lance of Project) Street Sign Fee Information not Avai lable (100% due riot to Acce tance of Project) Construction Inspection Fee Information not Available (100% due riot to Start of Construction) TOTAL $10,166.57 TOTAL AMOUNT DUE PRIOR TO COUNCIL APP ROVAL $728.52 DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Bible Fellowship DATE: 9/20/2002 Water Impact Fee: Domestic Meter(s): 1 - 1 1/2 inch Irrigation Meter(s): 1 - 2 inch 0 Fireline Meter(s): 1 - 10 inch Total #: 15.5 ESU's ~ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: = 5 ESU's = 8 ESU's = 0 ESU's = 2.5 ESU's $4,340.00 Total #: 3 Connections @ $50.00 ea. $150.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) Q $142.10 $142.10 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) [rrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) ~ $205.28 $205.28 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 1 Fireline Meter(s) ~ $3,010.67 $3,010.67 (100°~ due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) ~ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) (03 $30.00 ea. $80.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 ~ $280.00 ea. $1,400.00 (Due prior to issuance of building permit) Wastewater Tap Iospection Fee: Total #: 1 Connections ~ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots ~ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): • Preliminary plat approved: 0 Single-family ~ $0.00 per lot $0.00 0 Multi-family Q $0.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of--way. (See attached fee calculations if applicable) Construction Inspectioe Fees: $728.52 Information not Available Information not Available A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering pepartment. (2°h of development cost required for private improvements) (4°h of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Coppell Bible Fellowship DATE: 9/20/2002 ROADWAY IMPACT FEE: Service Area * 4 Cate o ** Institutional Land Use ** Church/S o e Buildin Area sf) 18,680 Develo ment Units ** 18.68 Vehicle Miles r Develo ment Unit ** 0.52 Fee er Vehicle Mile *** $300 IlRoadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile1= $2.914.08 * (Figure 2 -Roadway Impact Fee Study) ** (Table 3 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -Roadway Impact Fee Study) Donated 23,669 square feet of right of way for Sandy Lake. Purchase price was $2.28 per square foot. Value of right of way is $53,965.32. Per Resolution No. 031296.2, a credit in the amount of 75% of the assessed roadway impact fee can Ge applied to help offset a portion of the roadway impact fees. Percent of Credit Toward Roadway Impact Fees 75% Total Credit $2,185.56 AMOUNT DUE: $728.52 T H 6 C 1 T Y O P COPPELL ~ 7~ ~ T O e x A a , e a ENGINEERING DEPARTMENT FAX COVER SHEET T~~ M 1 K ~ .DR -J ~ From: P.O. Boot 478 255 Parkway Bh,d Coppell, TX 75019 Phone: (972)304-3679 Fax: (972)304-3570 Fax: 2I ~^ ~13 Q .- 54 b t Date: I p~ 2 5' O 2 Phone: Pages: (including cover sheet) ^ Urgent For Review ^ Please Comment ^ Please Reply ^ A4 Requested •Comments: X15 ~.D ~~E ~-SS~SS1n? ~ T- IF YOUDO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "~1'Of ~PPell Engmeenng-Excellence ByL>esrgn"