Loading...
PA9901-CS010426MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Larry Davis, Construction Inspector Engineering From: Danny Hightower, Utilities Division Public Works Date: April 26, 2001 RE: Walk -Thru for Wagon Wheel Park Phase I 1. Locate 1' valve installed. It's covered, cannot locate. 2. Need letter to not cover valves or manholes on landscaping. 3. Mark MLV on all PAD on main water in blue. 4. Test DC backflow; 2 vaults. 5. Need blue button on street to Fire Hydrant (2 6. Hydrant needs to be raised and test PSI after extension. 7. In air release valve box clean to cut off valve (3). 8. Clean 2" meter can to below lower fittings and cut -off valve. 9. 1 service needs curb stop and loop from meter. Clean below lower fitting on recheck and large meter can. 10. Stub out on sewer under building. V manhole needs to be raised to grade and rain pan. 11. Paint in RED "M.H." on road to mark manholes. 12. Raise 3'' manhole to grade. Chimney seal. 13. Paint sewer manhole lids red. 14. Reset 5' manhole; broken top. Reset top. 15. Regrate pipe to old manhole, last manhole. Call Danny Hightower at (972) 3043545 after work for recheck. CITY OFCOPPELL PUBLIC WORKS DEPARTMENT