Loading...
ST0102-CS021022 (4)r~Ken Gr,f,n:-: - RE: ................. Ruby Road Specs From: "Jack Evans" <jevans@pkce.com> To: "Paula Crocker" <pcrocker@ci.coppell.tx. us> Date: 10/22/02 12:14PM Subject: RE: Ruby Road Specs Paula, As per our conversation please find enclosed the revised portions to the Spec book. As I mentioned the items that are shaded or different color are the items that have changed. NOTE: While we were in the process of modifying the bid tabs I noticed that the quantity of 48" RCP ( Item No. I-19) was incorrect in the original bid. The number was 338 but should have been 378. Please note that all 48" RCP was removed as part of the Alternate Bid and replaced with 5' x5' Box Culvert. Please call if you have any questions. C. Jack Evans Project Manager Pacheco Koch Consulting Engineers 8350 North Central Expressway, Suite 1000 ph: (972) 235-3031 fax: (972) 235-9544 ..... Original Message ..... From: Paula Crocker [mailto:pcrocker@ci.coppell.tx. us] Sent: Tuesday, October 22, 2002 8:18 AM To: Jack Evans Subject: Ruby Road Specs CC: "Kenneth Griffin (E-mail)" <kgriffin@ci.coppell.tx. us>