Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ST9304-CS 930416 (2)
~kFebruary 9, 1989 cost estimates ~adjusted by 15% per letter from Wayne Ginn on June 21, 1993.~ The low &high were added together divided by 2, then adjusted by 15 %. / COPPELL DALLAS CROW- ~ % TOTAL '~ o°/o %'~ ~/o BILLINGSLEY ~AV~G/D~AGE~e/o) $1,134,056 '~1~ $3,~5,248 ~o/~ $1,530,975 6~/~) $5,670,279 ~GE "X-l" OVER ' -0- , ' -0- $1,025,8~ $1~025,8~ G~PEV~ C~EK ~ ~ X~G $54,050 $60,950 -0- $115,~ C~EK CH~~ -0- -0- $345,~0 $345,~ IZATION ~ RELOCATION $900,~ -0- -0- $9~,~ MOCK~GB~ ~ $402,5~ -0- $402,5~ $805,~ EXTENSION W/ SIGNAL & BR~GE MOORE ROAD -0- $86,250 -0- $86,250 SIGNA~ S~EET LIGHT~G $25,422 $ 67,368 $ 34,320 $127, 110 MED~N $59,8~ $158,470 $ 80,730 $299, ~ LA~SCAP~G $2,575,828 $3,378,286 $3,419,325 $9,373,439 ~ ~$2,600,000 ~ ~$3,40~000 ~ ~$3,400,000 ~ ~ $9,400,000 ~** FROM 9/17/93 LE~ER FROM TIM BRANCHEAU W/TU ..............................