Loading...
Amberpoint BP 2-LR021024REPORT OF LIME PLACEMENT Report Number: 94021380.0021 Service Date: October 18, 2002 Client: Transwestern Commercial Services Attn: James Gaspard 5001 Spring Valley Rd Ste 600W Dallas TX 75244 Report Date: Project: Staples 201 Northpoint Coppell, TX Project Number: 94021380 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 October 24, 2002 Services: Lime placement. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for lime placement. HBC'stechnician observed the lime placement in an area, linesAto J and 4 to 5, approximately 2, 912 square feet. No weight tickets were obtained on this date. Technician: Bradford T. Rengstorff Report Distribution: (1) Transweslem Commercial Services (1) Hill &Wilkinson, Ltd. (1) O'Brien & Associales (1) TechniStructures (1) City of Coppell - Bldg Insp (1) City of Coppell - Constr Insp (1) HBC Engineering (1) State Farm Insurance Reviewed by: HBC E~ Eugene Harbour Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the Location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials, Page 1 of 1 ~,-SK~-r,,~K.y REPORT OF SOIL-LIME MIXTURE PULVERIZATION IBC g901 Carpenter Frwy., Suite Dallas. Texas 75247 Date of Service: Client No.: Client: Contractor: Test Location: 10/24/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd Ste 600W Dallas TX 75244 Hill & Wilkinson Building Pad Subgrade Test Method: NTCOG Report No.: Project No.: Project: Specification Requirements: 94021380.0034 94021380 Staples 201 Northpoint Coppell, TX Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Condition: Field Moist TEST 1-3/4" SIEVE #4 SIEVE NO. LOCATION % PASSING % PASSING 1 Grid Line G.5/1.2 100 66 2 Grid Line E/1.2 100 69 3 Grid Line B.5/1.2 100 70 NOTE: Remix of lime treated material was stopped due to rain. Technician: B. Rengstorff Report Distribution: (1) Transwestem Commercial Services (1) Hill & Wilkinson, Ltd. (1) O'Brien & Associates (1) TechniStructures tlw (1) City of Coppell - Bldg Insp (1) City of Coppell - Constr Insp (1) State Farm Insurance (1) HBC Engineering Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering.