Loading...
Gateway BP(1.4)-LR021022Specification Sieve Size Percent Passing Sieve Size Percent Passing 1 -3/4" 100 #4 60 Date Location Passing 1 -3/4" Sieve Passing #4 Sieve 10 -02 -02 Paving extension: 30'S, 12'E(1) 100 60 Paving extension: 40'S, 20'E(1) 100 64 REPORTED TO: Catellus Development Corp. 5720 LBJ Freeway, Suite 190 Dallas, Texas 75240 ATTN: Mr. Robert McCann CONTRACTOR: John S. Burns Construction Mail Distribution: (1) Catellus Development Corp./ Mr. Robert McCann (1) City of Coppell /Mr. Larry Davis (1) John S. Burns Construction/ Mr. Rich Kretsch (1) Halff Associates, Inc./ Mr. Travis Markham REPORT OF FIELD GRADATION TESTS Haverty's Infrastructure Gateway and Exchange Coppell, Texas Footnote: (1) Measurements referenced from S.E. corner of the northend. 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019 REED Er1G IfIEEFiIrlG GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS REPORT NO. 10 REPORT DATE: 10 -22 -02 REG PROJECT NO. 9256 TECHNICIAN: T. Belew PAGE: 1 of 1 Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Keith E. Atkins Manager, CMT BW /cn GI=1CDLJ