ST0001-CS021030Larry:
ISI and Olden started the modular block retaining wall repairs on October
29. They want to have a field meeting to look at the repairs on October 31
at 10:00. Let me know so that I can get back with Dennis.
Suzan
w�-
T,-::?.. •� �'� -tom �i'z v s. yl�
pall A74 Soto PP
2 you
u'N' C�r
v
l I ) q- a t�
10' �