Loading...
Sherrill L2B-CS020905DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Angier's Professional Building. Site Plan request to allow the development of two medical office buildings containing a total of 12,464 square -feet, on 1.44 acres of property located along the south side of Belt Line Road, approximately 1,700 feet east of MacArthur Boulevard, at the request of Pogue Engineering. STAFF REP.: Andrea Roy DRC DATE: August 29, 2002 and September S, 2002 CONTACT. Teresa M. Turner, E.I.T., Graduate Engineer (972)304 -3681 COMMENT STATUS: PRELIARNAR ✓FINAL €D 1. The public section of the sanitary sewer line must be a minimum of 8" in diameter. 2. The waterline should be 8" rather than the 6" shown. The waterline can remain a public line as shown. 3. Plug the 8" waterline outside of the pavement within an easement intended for future extension of the waterline. (See attached) 4. Obtain a letter of intent from the adjacent property owner (4.512 acre tract, The Frances Group) to extend the 8" waterline and loop back to Beltline Road, either by tying into the Sherrill Acres 8" waterline or the 12" waterline on Beltline Road, once the property is developed. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Sherrill Acres Lot 2B. Final Plat request to allow the development of Angier's Professional Buildings, two medical office buildings containing a total of 12,464 square feet on 1.44 acres of property located along the south side of Belt Line Road, approximately 1 feet east of MacArthur Boulevard, at the request of Pogue Engineering. STAFF REP.: Andrea Roy DRC DATE: August 29, 2002 and September S, 2002 [ COT. Teresa M. Turner, E.I.T., Graduate Engineer (972)304 -3681 =COZMMEN TATU S: ✓FIlVAL R€WS€D 1. Include a 20' x 20' utility easement adjacent to the firelane hammerhead for future extension of the 8" waterline.